Other Preparations - Hitachi GS4000 Series Quick Start Manual

Hide thumbs Also See for GS4000 Series:
Table of Contents

Advertisement

GS4000 Quick Start Guide, Revision 3

3.2 Other Preparations

3.2 Other Preparations
●Confirm the process GS4000 goes through until it starts to run.
GS4000 goes through the following process until it starts to run after it is powered on.
BCU0 LED
MEMORY CARD0 ACC LED
1.
After being powed on, GS4000 starts to show green-color blinking of BCU0 LED on its front panel as its startup
process.(Both BCU0 LED and BCU1 LED is blinking in green if a redundant BCU is used.)
2.
Software loading starts and MEMORY CARD 0 ACC LED of BCU0 is lit.
At this time, BCU0 LED is still blinking in green.
3.
Software loading is finished and BCU0 LED is lit in green.
(Both BCU0 LED and BCU1 LED is lit in green if a redundant BCU is used.)
●Software installation
Software is pre-installed into a memory card at the time of shipment of GS4000.
When installing software, refer to the Installation Guide provided with the routing software OS-SW.
●Installation of option components
The option components such as a power supply unit, basic control unit, packet routing unit and network interface
board are pre-installed into a body of GS4000 at the time of its shipment.
Note that GBIC, SFP, and XFP are also pre-installed into a network interface board in case that you purchased them.
Regarding the attachment/detachment of GBIC/SFP/XFP, see the GS4000 Hardware Installation Guide.
●Details about a body of GS4000 and option components
See the GS4000 Hardware Installation Guide if you want to know the details about GS4000 including the name of each part of
its body and the names of its option components.
30
GS4000 powered
Preparatory process
Blinking in
Lighting in
GS4000 started
Running
Lighting in green
Light out
QSGGS4KX10-00 5794092-2X

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents