This manual applies exclusively to the bifacial module (here in after referred to as Module) of GCL System Integration Technology Co., Ltd. (here in after referred to as GCLSI). The contents of this manual involve the installation methods, operation safety and maintenance information of GCLSI’s Modules.
Do not use sharp objects with Modules Do not stamp on Modules Do not touch Modules with bare or dirty Do not pile up Modules on uneven ground Do not drop or throw Modules hands GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 5
6. One module shall be handled by two outer packing box can be stacked not people together. exceed the maximum layer allowed .(n=2 means it is allowed to stack for at most two layers.) GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 6
It is prohibited to stack the Modules in the project site. During the transportation at the project site, the Modules shall not be stacked, but only allowing for one layer in transportation. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 7
7. Every module shall be carried by two people. When carrying the module by two people, it is prohibited to pull the junction box. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Local latitude + 5° 30° -35° Local latitude + 10° 35° - 40° Local latitude + 15° >40° Local latitude + 20° Table 1 Mounting Tilt Angle of Modules GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 9
It is necessary to always observe the instruction guide and safety rules attached for module installation. It is prohibited to drill the holes in the glass surface. Otherwise, it will invalidate the quality guarantee. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 10
GCL-M3/72GDXXX 1600 1600 2400 3600 GCL-M/P3/60GTXXX 1700*1034*6 300-400 300-400 1600 1600 2400 3600 GCL-M10/60GTXXX 1980*1166*6 400-500 400-500 1600 1600 Note: Test load = γm( × design load safety factors) GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 11
Installation tool: 13mm socket wrenches (electric wrenches optional), torque wrenches 10-100 N.M; Tightening torque of the clamp: 16 N.M~20N.M. Side clamp, middle clamp: including lower and upper EPDM blocks, fastener combination (M8 bolt, washer, spring washer, nut). GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 12
The module may be installed horizontally and vertically. Installation steps Step 1: install the support. Install the track support. Step 2: Install the clamp. Fix the clamp on the support with the nut not tightened. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 13
MECHANICAL INSTALLATION Step 3: Install the module. Install the module into the clamp as required , and tighten the nut with the torque of the clamp: 16 N.M~ 20 N.M. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 14
Table 4 Installation Method Installation Method C Installation Method D Clamping on the long side Installation Method E Installation Method F Clamping on the short side Note: The length of the clamp≥50mm. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 15
1600 GCL-M10/60GDFXXX 3600 1908*1134*30 427~572 1600 3600 GCL-M12/60GDFXXX 2172*1303*35 493-593 1600 3600 GCL-M12/66GDFXXX 2384*1303*35 546-646 275-375 275-375 1600/1600 1600 Note: Test load = γm( × design load safety factors) GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 16
MECHANICAL INSTALLATION Installation with the mounting hole Table 6 Installation Method Installation Method G Installation Method H Mounting on the long side GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 18
1085 —— —— —— —— GCL-M12/60GDFXXX 2172*1303*35 1400 1254 3600/1600 —— —— —— —— GCL-M12/66GDFXXX 2384*1303*35 1400 1254 3600/1600 Note: Test load = γm( × design load safety factors) GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 19
Steel material: stainless steel Material: stainless steel Material: stainless steel Size: M8 Size: M8 Size: M8 Size: M8 The range of torque for screw tightening is 14N.m to 20N.m. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 20
Secure the module in each fixing location with an M6 bolt, two flat washers, a spring washer and nut as shown in Figure 7, torque: 9~12 N.m. Figure 7 GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
(as shown in Figure 9). Fuse is necessary for each module string. Take reference to the local regulation. Recommended maximum parallel Modules configurations: Fuse rating/ (1.3* short-circuit current). GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 22
To reduce lightning damage, the loop area should be kept as small as possible when laying cables. It is recommended to use fuses in each string. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
In a system with batteries, if the controller doesn’t have the function of backswing protection, block diodes installed between the battery and the Module can prevent the reverse current from damaging the Module. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
When exposed to the sunshine, the Modules will produce high voltage. The repair work must be carried out by professionals. Warning: Shut down the system before any electric repair. Improper maintenance may cause electric shock or fire. GCL System Integration Technology Co., Ltd. Bring Green Power to Life...
Page 26
Bring Green Power to Life GCL System Integration Technology Co., Ltd. Add.: F3, GCL Energy Center, No. 28, Xinqing Road, Suzhou Industrial Park, Jiangsu Province, China Tel.: +86-512-6983 2860 (customer-service hotline) Fax: +86-512-6983-2777 gclsiinfo@gclsi.com Email:...