Carefully select the BLOOM installation location based on the requirements specified in this section. Locate and secure the BLOOM on a concrete pad or other firm, level surface that is at least 44 in long x 23 inches wide. Maintain a clearance of at least 30 inches on all sides to allow access for servicing and maintenance to the front and back of the BLOOM.
Pentair BLOOM 150 GPM 16.9 Pentair PARTS AND ACCESSORIES The parts shown in Table 2 are offered as accessories available for purchase with all BLOOM models. Table 2. High Pressure Oxygen Regulator Kit Parts List (P/N:99K0-001) Image QTY Part Description...
The following guidelines are recommendations for tanks with intake structure submergence. depths less than15 ft (4.5m). Upon delivery, unscrew the shipping screws to remove the BLOOM unit from the shipping crate. Inspect the BLOOM for any damage or loose parts that may have occurred during transport.
(i.e., when the tank water surface level is above the suction intake and the BLOOM pump). Refer to Figure 7 for BLOOM enclosure dimensions and suction and discharge fitting locations.
BLOOM centerline. The suction pipe leading to the pump and the pump must primed to lift liquid from the tank to the BLOOM. Figure 4. Isometric View Suction Lift Installation Do not run the pump dry.
3" 150 BLOOM Piping connections for all sizes of BLOOM are provided below. Verify the type of pump provided with your BLOOM before beginning installation. These materials are not included with a purchase of a BLOOM, but can be found at most hardware stores.
Figure 6. Isometric views of BLOOM with Components Description Suction Piping Installation Install piping as close to the water body as possible. Keep pipe length as short as possible and configure suction piping in a manner that minimizes the number of fittings (bends) and valves.
BLOOM. Verify that the intake screen is rated for the flow liquid capacity of your BLOOM and does not restrict the generator’s design liquid flow rate.
CIP Valve Installation (Optional) Two optional shut-off valves can be used to isolate the BLOOM from the rest of the system for Clean in Place maintenance. See Table 4 for CIP valve sizes recommendations. Connect Power to Control Box. WARNING: Before connecting power, verify the voltage, phase and amps requirements of your BLOOM.
QUICK STARTUP GUIDELINES WARNING: Refer to the operating manual for important safety and startup information. When all piping is installed and pipe glue cure time has been met, connect electricity in accordance with applicable Local Electrical Code and ordinances. The use of an extension cord is hazardous and should be avoided.
Page 15
Step 5. Check piping for visible leaks. If your BLOOM pump is equipped with a pump strainer, verify through the clear window in the strainer lid that there are no bubbles entering in through the liquid suction stream.
Suction Lift Applications: Pump Priming Instructions Step 1. Open the intake and discharge valves to flood piping. Intake and discharge valves. Step 2. Turn on the main power by using the green selector switch. - 15 -...
Page 17
Step 5. Check piping for visible leaks. If your BLOOM pump is equipped with a pump strainer, verify through the clear window in the strainer lid that there are no bubbles entering in through the liquid suction stream.
Gas Flow Rate (Standard) 0-2.5 CFH 0-5 CFH 0-10 CFH (US) & (EU) (Rotameter) If the BLOOM unit is consistently operating outside of the ranges shown in Table 4, contact a Moleaer technical service representative at (424) 558-3567. - 17 -...