AEH 20000 - Hybrid power cabinet 1. About this manual This chapter describes the contents of this manual, target reader, and safety symbols, can help users to have a better understanding of the manual. 1. About this manual 1.1 Target readers 1.2 How to use this Manual...
AEH 20000 - Hybrid power cabinet 1.1 Target readers 1. Only professional electricians or professionally qualified personnel can transport or install this product. 2. The operator should be fully familiar with the structure and working principle of the entire Energy Storage system;...
Page 4
AEH 20000 - Hybrid power cabinet Caution, protective conductor terminal The AEH has to be firmly grounded to ensure the safety of personnel. PE TERMINAL Caution, risk of electric shock, energy storage timed discharge. Electrical shock danger exists in the capacitor; the caver shall be: moved at least 5 WARNING minutes later after all powers are disconnected.
2.1 Installation Proper installation requires following all the instructions in the user manual involving transportation, mounting, wiring and commissioning. SIREA does not cover warranty for the AEH damage due to failing to use it properly. The protection level of the AEH is IP54, which is designed for indoor installation. Please refer to chapter 4 for installation instruction.
EMC might not comply with the required standard. Function and safety parameters Don't change the parameters of the AEH without authorization from the local utility and SIREA. Otherwise, it might lead to injury or equipment damage and the warranty of the AEH will be voided.
AEH 20000 - Hybrid power cabinet lnverter may generate some noise and electromagnetic radiation during operation. According to EMC emission and noise level, AEH should be used in industrial environments. Hence, ail personnel should not stay long near the AEH.
AEH 20000 - Hybrid power cabinet 3. Product description 3.1 Energy storage system AEH cabinet are designed for energy storage and photovoltaic system, it converts DC current generated by PV modules into DC for battery bank and AC current and feed it into the load/grid. DC for...
AEH 20000 - Hybrid power cabinet 3.3 The layout of the main components Name Description Fan for heat extraction Cabinet IP54 IK10 cabinet Operation information display and control Touch screen command Lock to open door with Lock double bar key...
AEH 20000 - Hybrid power cabinet Off-grid mode 1. AEH connected to PV modules on DC side and grid on the AC side; 2. AEH connected to AC load and AC supply (grid or genset) 3. Batteries started. 4. Every switches and breakers on a.
AEH 20000 - Hybrid power cabinet CAUTION Strictly prohibited storage without packing ! ● Avoid storage in direct sunlight! ● Keep upright and no stacking on top of the crate. CAUTION ● 3.8 Dimensions SIR-AEH20000-EN-NT-REV3 PAGE 11 / 25...
AEH 20000 - Hybrid power cabinet 4. Product description 4.1 Installation condition requirements To ensure normal operation of the machine, the installation environ mentis required as follows: The ingress protection of AEH is IP54. Moreover, as this product is an electronic equipment, it ●...
AEH 20000 - Hybrid power cabinet Ventilation requirement ln operation, AEH will produce a lot of heat. When ambient temperature is too high, the electrical property of the equipment may be affected, the equipment may even be damaged. Therefore, the heat release shall be fully considered in designing the contrai room to ensure operation of the equipment in high efficiency.
Note 1: The cabinet is integrated and cannot be disassembled either in transportation or installation. Any fault attributed to modification unauthorized by SIREA is beyond the quality assurance. Note 2: ln movement, tilt, violent shake or sudden force upon the AEH shall be prevented, such as sudden down of lifting.
AEH 20000 - Hybrid power cabinet Battery The positive and negative highest voltage of the battery shall not exceed 60V, otherwise, the equipment will be in over-voltage protection state, and cannot work normally. Three-phase grid lnverter will continuously inspect whether the grid satisfies the grid connected conditions. The...
AEH 20000 - Hybrid power cabinet 4.4.4 Earthing Cabinet must be earthing well for safety; Please make sure of the connection between PE in power distribution cabinet and PE copper in the AEH good; and make sure the earthing cable more than 16mm2 and the earthing resistance must satisfy the demand of IEC standard.
AEH 20000 - Hybrid power cabinet 5. GUI (Graphic User Interface) instruction 5.1 LCD display screen introduction User can view the information of the cabinet operation on the LCD touch screen. After powering on the LCD will enter on the home page after about 15s. Then you can begin to read the information.
AEH 20000 - Hybrid power cabinet On this situation, the photovoltaic power is mixed with grid power to charge battery and ensure load power. The total amount of load power is 1898W and a backup load power include in the total load is 544W. If there is a grid blackout, the battery will continue to power only the backup load of 544W in off grid mode.
Page 19
AEH 20000 - Hybrid power cabinet You can select the time range view (1 hour, 24 hours or 1 week), the default range is 1 hour. On the next page (button on the bottom right corner), you can see information related to the battery(ies).
AEH 20000 - Hybrid power cabinet 5.3 Alarms If an alarm is set, a buzzer is rising and a bell is shown on the top left corner of the home page. After clicking on it, you will be able to see the current alarms.
Page 21
AEH 20000 - Hybrid power cabinet Here is the list of the AEH’s fault code which can appears on the bottom of the alarm page : Fault code number Fault code list BUS exceed the upper limit BUS drop to the lower limit...
Page 22
AEH 20000 - Hybrid power cabinet AC output voltage too low AC output voltage too high Control board wiring error AC circuit voltage sample error AC N wire current over Negative power detected Driver signal lost from relay board Communication lost between main board and relay board...
AEH 20000 - Hybrid power cabinet 6. Routine maintenance Regular maintenance ln order to ensure the normal operation of the AEH, regular maintenance work is required. Recommended routine maintenance cycle and work, as shown in table below : Maintenance item Frequency Clean or replace the dust screen .