Unloading:
The panels can be unloaded from a lorry using a forklift truck or a crane. When lifting, special care must be taken to ensure that the
panels cannot slip or fall off.
Storage: Never stack directly more than 20 panels at a time.
Storage: Never stack more than 20
panels on a stake rack.
Do not move more than 2 stake racks
at a time using a forklift truck.
Move only one stake rack at a time
using a chain sling.
Distribution Partner: Fomacon Group
Mörsenbroicher Weg 191 | D- 40470 Düsseldorf
General information
Tel.: +49 211 975 323 90
Free call: +49 800 11 00 77 5
produced by:
www.vario-mat.com
E-Mail: info@vario-mat.com

Advertisement

loading

Summary of Contents for OKULEN VARIO mat 2

  • Page 1 produced by: General information Unloading: The panels can be unloaded from a lorry using a forklift truck or a crane. When lifting, special care must be taken to ensure that the panels cannot slip or fall off. Storage: Never stack directly more than 20 panels at a time. Storage: Never stack more than 20 panels on a stake rack.
  • Page 2 produced by: Use of the panels: Both sides of the panel can be used. The upper side has a high profile surface (suitable for the use of construction vehicles). The underside has a lower profile pattern (suitable for predominant use by pedestrians). Distribution Partner: Fomacon Group Tel.: +49 211 975 323 90 www.vario-mat.com...
  • Page 3 produced by: Connecting the panels: The panels are connected and screwed together using washers and screws (M16x30mm). All adjacent panels must be connected in this way. Always install the panels so that the surfaces of the same type face upwards. Connecting the panels together (vehicle side): The panels are connected and screwed together using washers and screws (M16x30mm).
  • Page 4 produced by: Connecting the panels to the ramps (vehicle side): The panels are connected and screwed together using washers and screws (M16x30mm). All adjacent panels must be connected in this way. Always install the panels so that the surfaces of the same type face upwards. Ramp above: 0.9m long: 3x screws M16x30, 3x washers for screws M16 Ramp above:...
  • Page 5 produced by: Connecting the panels together (pedestrian side): The panels are connected and screwed together using washers and screws (M16x30mm). All adjacent panels must be connected in this way. Always install the panels so that the surfaces of the same type face upwards. 2m side: 3x screws M16x30, 3x washers for screws M16 1m side: 2x screws M16x30, 2x washers for screws M16 Distribution Partner: Fomacon Group...
  • Page 6 produced by: Connecting the panels to the ramps (pedestrian side): The panels are connected and screwed together using washers and screws (M16x30mm). All adjacent panels must be connected in this way. Always install the panels so that the surfaces of the same type face upwards. Ramp above: 0.9m long: 2x screws M16x30, 2x washers for screws M16 Ramp beneath:...