Page 1
produced by: General information Unloading: The panels can be unloaded from a lorry using a forklift truck. When lifting, special care must be taken to ensure that the panels cannot slip or fall off. The panels can also be unloaded and installed using a crane. Storage: Never stack directly more than 5 panels at a time.
Page 2
produced by: Lifting and laying: Each panel has 4 lifting lugs. A lifting device must be inserted into each eyelet. These devices must in turn be connected to a lifting hook (on a chain sling). With the help of the chain sling, the panel can be moved to the desired position and installed. Distribution Partner: Fomacon Group Tel.: +49 211 975 323 90 www.vario-mat.com...
Page 3
produced by: Connecting 2 panels: Connect and screw the panels together using the 2-way connecting cover panel and 2 hexagonal screws (M16x30mm). All adjacent panels must be connected in this way. Connecting 4 panels: Connect and screw the panels together using the 4-way connecting cover panel and 4 hexagonal screws (M16x30mm). All adjacent panels must be connected in this way.