Download Print this page

AdvanteX VCOM AX20-A1 Installation Manual

Advertisement

Quick Links

VCOM AX20-A1 Control Panel Installation Manual
A
Panel
for Gravity Discharge
Successful installation of an AdvanTex Control Panel requires an understanding
of all this information.
So, before rolling up your sleeves, please take the time and read through this manual.
Reading this manual and maintaining current and accurate records will save everyone time,
trouble, and money in the long run.
Anchorage Tank II Inc., 2723 Rampart Drive, Anchorage, AK 99501 907-272-3543 anchoragetank.com
Page 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the VCOM AX20-A1 and is the answer not in the manual?

Questions and answers

Summary of Contents for AdvanteX VCOM AX20-A1

  • Page 1 VCOM AX20-A1 Control Panel Installation Manual Panel for Gravity Discharge Successful installation of an AdvanTex Control Panel requires an understanding of all this information. So, before rolling up your sleeves, please take the time and read through this manual. Reading this manual and maintaining current and accurate records will save everyone time, trouble, and money in the long run.
  • Page 2 VCOM AX20-A1 Control Panel Installation Manual Installing the Control Panel In the Municipality of Anchorage, an electrician must be employed to do the wiring. Outside the city, whether required or not, this is a good idea unless one is thoroughly familiar with wiring and local codes.
  • Page 3 VCOM AX20-A1 Control Panel Installation Manual Installing the Control Panel Floats and Pumps Key Points: At this point, the fl oats and pump is in place and their wires have been stabbed into the splice box. Just in case they aren’t, thread the fl oat and pump cords through Do not remove the colored...
  • Page 4 VCOM AX20-A1 Control Panel Installation Manual Connecting to the Control Panel Connect the wires coming from the fl oats to the terminals in the Control Panel. Refer to the appropriate Float & Splice Box Wiring Diagram for the Key Points: correct terminal locations for your system.
  • Page 5 VCOM AX20-A1 Control Panel Installation Manual Control Panel Wiring Diagram Ground PUMP CONTROLS Neutral Ground Pump L1 PUMP Controls L1 CONTROLS Pump Neutral Controls Neutral Anchorage Tank II Inc., 2723 Rampart Drive, Anchorage, AK 99501 907-272-3543 anchoragetank.com Page 5...
  • Page 6 VCOM AX20-A1 Control Panel Installation Manual Float and Splice Box Wiring Diagram Contrary to what this diagram shows, Orenco no longer color codes their fl oat wires. IMPORTANT: Because of this, you will want to mark the yellow fl oat cords yourself with a black Sharpie pen.
  • Page 7 VCOM AX20-A1 Control Panel Installation Manual Control Panel Operation What’s so special about this gray box? The VCOM-AXA telemetry-enabled panel is used for remote moni- toring and control of timed, recirculating simplex pumping operations with gravity discharge. Basic control logic manages the day-to-day functionality of the Control Panel.
  • Page 8 VCOM AX20-A1 Control Panel Installation Manual Now that you are fi nished..call Anchorage Tank When the system is complete and the communication line is installed, please give a call to Anchorage Tank so we can get it registered with both Orenco Systems and VeriComm, and schedule the System Start-Up with the Service Provider.