Chapter3. System Setup; Power Installation Procedure - NOVAKON X12 Series User Manual

12.1" fanless multi-touch panel pc with intel® celeron® j1900 processor
Table of Contents

Advertisement

Chapter3. System Setup

3.1 Power Installation Procedure

Step 1. Connect a power cord to the power adaptor.
AC to DC power adaptor specification
1. Input support voltage: 110V ~ 240V AC power , 50~60Hz
2. Output support voltage: 12V DC power @5A MAX
3. 0~40 degree C operating temperature
Step 2. Connect another male plug of the power cord to an electrical outlet.
Step 3. Connect the Phoenix Connector Terminal into the system's Power Input
Connector.
WARNING:
1. After plugging phoenix connector , be sure to fasten the two
screws to lock the connector.
2. White cable stands for 12V , block cable stand for GND. Make
sure you plug connector in correct direction.
Page 13

Advertisement

Table of Contents
loading

Table of Contents