Download Print this page

Advertisement

Quick Links

Dashr|Jump Components
LED for command
verification with App
Vertec attachment
point
Cylinder for Vertec
vane reset tool
USB ports
Power cable
www.dashrsystems.com
www.dashrsystems.com
Email: info@dashrsystems.com
Phone: 844.44.DASHR
Barrel Jack
power plug
¼-20 thread for
mounting to the
ball joint
Battery level indicator
More instructions and videos can be
found on our website at
www.dashrsystems.com.
Visit us online to learn more ways to
make testing easier and more efficient.
U
M
SER
ANUAL
Dashr uses a mobile application to control Dashr hardware and display testing
results. The free Dashr App can be downloaded from both the Google Play Store
and the Apple App Store. If you do not have an account, please visit
dashboard.dashrsystems.com to create one.
The Dashr|Jump system is currently designed to integrate with the Vertec vertical
jump measurement device. But this system will work with any vane based vertical
jump measurement system if you find a way to attach it.
Step 1: Remove the screw and washer that connects the white plastic cylinder at
the base of the vanes.
Required Tools
Step 2: Use the screw and washer to attach the
Dashr|Jump ball-joint coupler.
Step 3: Use the ¼-20 threads to attach the Jump
module to the coupler. Note that the plastic nut
on the coupler can be used to tighten the
connection. Make sure that the LED is oriented
towards the ground. The power cable will need
to be inserted prior to final alignment.
Step 4: Use the Velcro strips (supplied) to
attach the rechargeable Dashr battery to
the Vertec.
Results You Can Trust
Jump
1. Download our App
2. Jump Station Installation

Advertisement

loading

Summary of Contents for Dashr Jump

  • Page 1 Dashr uses a mobile application to control Dashr hardware and display testing results. The free Dashr App can be downloaded from both the Google Play Store and the Apple App Store. If you do not have an account, please visit dashboard.dashrsystems.com to create one.
  • Page 2 Step 5: Login to your Dashr App and navigate to the Vertical Jump drill. Step 1: Login to your Dashr App and follow Steps 5-7 from the installation Step 6: Power up the Jump module by plugging it into the Dashr battery and instructions.