Download Print this page
Hussmann LG Installation Instructions
Hussmann LG Installation Instructions

Hussmann LG Installation Instructions

Wall/island merchandiser (solid and glass front)

Advertisement

PARTS LIST
Item No.
Quantity
L LG
LN LNG
1.
1
1
1
2.
1
1
3.
6
5
4.
6
5
5.
6
5
6.
6
5
7.
1
8.
1
9.
4
4
10.
1
11.
1
1
NOTE: Be sure merchandisers
have been leveled according to the
installation instructions. Carefully
unpack and inspect the Wall/
Island Joint Kit, making sure there
is no breakage or damage. Be
sure factory-installed nut retainers
and alignment pins are in place.
S S T T E E P P S S
1
Apply Gaskets — — 1 and 2
as shown in Figure 1.
• Remove paper backing as
gasket is applied.
• Lap gaskets at lower corners.
• Check that there are no gaps
between gasket and merchan-
er.
dis
• Do not stretch gasket,
especially around corners.
• Do not butt gaskets; always
overlap joints.
A.
Remove Honeycomb at
end to be joined by lifting up
at bottom and pulling for-
ward.
B.
Lift out Rear Panel.
C.
Remove Front Panel.
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.)
®
Merchandisers
LI
LIG
1
1
1
1
1
1
1
6
4
6
4
6
4
6
4
6
4
6
4
6
4
6
4
2
2
1
1
4
4
4
4
2
1
2
1
See Figures 1, 2 and 3 for gasket, hole and fastener locations for all models.
Foam Tape Gasket
C C
Figure 1. Installing Gasket for Solid and Glass
Description
Gasket
1
/
x
1
/
x 120
2
2
Donut Gasket
Cap Screw
5
/
-18 x 1
16
Lock Washer Split Steel
Flat Washer
5
/
16
Hex Nut
5
/
- 18
16
Glass Post Joint Extrusion
Glass Post End Cover
Screw Phillips Sheet Metal 8 x
Nosing Joint Trim
Joint Trim
1 /
1 /
2 X
2 X180
NOTE: A
G
T
PPLY
ASKET
O
1
A
B
Detail A
1
2
1
L
Splashguard Brackets
MUST BE INSTALLED
Before Piping Case.
NOTE:
Refer to the
Installation Manual to
install splashguard
5
/
16
L
1
/
2
L N
,
LI
Donut Gasket
O
C
O
.
NE
ASE
NLY
1
A
Detail A
B
C C
LG
March, 1998
P/N 403099A
LG
LNG
LIG
2
1

Advertisement

loading

Summary of Contents for Hussmann LG

  • Page 1 Remove Honeycomb at end to be joined by lifting up at bottom and pulling for- ward. Lift out Rear Panel. Remove Front Panel. HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) ® Description Gasket x 120 Donut Gasket Cap Screw...
  • Page 2 Detail A). Alignment Pin Locations L-8G Glass Detail A Figure 2. Aligning and Joining Cases Detail A Figure 3. Installing Joining Bolts and Joining Cases HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) ® Case 1 Case 2 Detail A...
  • Page 3 Glass End Post Glass Glass Gasket Top View Figure 4. Installing Glass Post Joint Extrusion Figure 5. Installing Glass Post End Cover HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) Glass End Post Gasket Gasket P/N 403999A NSTALLING LASS...
  • Page 4 Figure 8. Installing Plastic Rails — — — — — Figure 6. Identifying Cases with Joint Trim L-G Glass L Solid Figure 7. Locating Trims HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) ® — — — L-8G Glass L-8 Solid...

This manual is also suitable for:

LiLigLnLngImpact lgImpact li ... Show all