VERTICAL, 90 DEGREE ELBOW TO HORIZONTAL OUT THE
WALL (12 inch minimum rise before elbow)
Dimensions (in inches)
A
B
9
14 to 15-1/2
12
17 to 18-1/2
18
20 to 21-1/2
CORNER INSTALLATION - VERTICAL, 90 DEGREE ELBOW
TO HORIZONTAL OUT THE WALL (12 inch minimum rise
before elbow)
DIMENSIONS (in inches)
DIM.
DVCX36
A
B
33-1/4
C
13-3/4
D
66-3/8
Page 18
INSTALLATION (continued)
C
4-3/4 to 6-1/4
4-3/4 to 9-1/4
10-3/4 to 12-1/4
Figure 24
DVCX42
47
49-7/8
35-1/4
15-1/8
70-1/2
Figure 25
After installing the vent system, install flue heat shield.
1.
Hand bend tabs on flue heat shield out 90°.
Attach to insulation box as shown in Figure 26.
2.
Figure 26 (vent pipe removed for clarity)
35362-5-0217