Lennox Allied Air A93UH1E Installation Instructions Manual page 28

Warm air gas furnace upflow/horizontal left and right air discharge
Table of Contents

Advertisement

3" (76MM) MIN.
Inches (MM)
8" (203MM) MIN
12" (305MM) ABOVE
AVERAGE SNOW
ACCUMULATION
3" (76MM) OR
2" (51MM) PVC
PROVIDE SUPPORT
FOR INTAKE AND
EXHAUST LINES
Figure 36. Direct Vent Roof Termination Kit
15F75 or 44J41
Figure 37.
Figure 38.
Page 28 of 55
SIZE PER EXHAUST PIPE
TERMINATION SIZE
REDUCTION TABLE
UNCONDITIONED
ATTIC SPACE
1/2" (13MM) FOAM
INSULATION IN
UNCONDITIONED
SPACE
Issue 1922
5.
On field supplied terminations for sidewall exit, exhaust
piping may extend a maximum of 12 inches (305 mm)
for 2" PVC and 20 inches (508 mm) for 3" (76 mm)
PVC beyond the outside wall. Intake piping should be
as short as possible. See Figure 44.
6.
On field supplied terminations, a minimum distance
between the end of the exhaust pipe and the end of
the intake pipe without a termination elbow is 8" and a
minimum distance of 6" with a termination elbow. See
Figure 44.
7.
If intake and exhaust piping must be run up a side
wall to position above snow accumulation or other
obstructions, piping must be supported every 24"
(610 mm) as shown in Figure 44. Exhaust and
intake piping that is run up a wall is considered to
be in an unconditioned space, so piping should be
sized according to Table 7. The intake piping may be
equipped with a 90° elbow turndown. Using turndown
will add 5 feet (1.5 m) to the equivalent length of the
pipe.
8.
A multiple furnace installation may use a group of up to
four terminations assembled together horizontally, as
shown in Figure 42.
Figure 39.
507867-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Allied air 92g1uhe

Table of Contents