Page 1
TWO POST LIFT LJCC2040A ’ ’ Manufacturer:...
Page 2
user’s manual MANUFACTURE AND SERVICE AGENT TWO POST LIFT Model: Serial no.: Manufacture date: Manufacture: Name: Address: Telephone: Fax: http: E-mail: AUTHORIZED SERVICE CENTRE...
Page 3
user’s manual INSTRUCTION -Though we have considered about the machine safety during design and manufacture, proper training and frequent operation can be better for the safety. Forbid to operate or repair the lift without reading this user’s manual. -Check the nameplate on motor and currency request on nameplate, only professional electrician is allowed to connect the power.
user’s manual Chapter 1 Packing Discharge the outside packing and other packing material, to check whether any damage or missing during transportation according to “packing list”. If find damage or missing, should notice the carrier immediately. PACKING Standard scheme: main post and its components, sub post and its components(1#) , hydraulic unit(2#)...
user’s manual Chapter 3 Installation 3.1 INSTALLATION NOTIC -Improper installation will cause damage to machine or personnel. We do not take responsibility to any direct or indirect damage due to improper installation or operation. -The proper installation floor should be level, to ensure level lifting and lowering. Any slant can affect the performance of the machine.
Page 9
user’s manual Chapter 3 Installation 3.2.3 INSTALLATION DRAWING OF POST Picture 4 (post installation) Notice: Drill hole withφ19mm aiguille and then anchor with pneumatic tools. The depth of hole and bolts should be the same and insert the bolt. The air anchor, made against the washer to under the post. When fastening to the use of torque wrench, do not use impact tools to tighten.
user’s manual Chapter 3 Installation Picture 7 oil pipe connection cable 3.2.7 STEEL CABLE INSTALLATION 1 Open the cover of carriage and fix the carriage on the first tooth. Connect the steel cable and tighten the nut. 2 Set the carriage on the lowest locking point, and then adjust the steel cables. 3 Ensure no cross and mistake installation of cables, also ensure the steel cables are on top the pulley.
Page 11
user’s manual Chapter 3 Installation INSTALLATION OF ARMS: -Fix the long and short sway arms with hinge axis on the carriage according to the floor layout. -Install the correspond long and short extension arms and fix with M8×12 bolt to avoid slipping. -Put the adapter to the holes on extension arms (can choose differ height adapter to suit different height chassis)(see picture 8:) Bolt limit...
user’s manual Chapter 4 Adjustment 4.1 PREPARATION BEFORE ADJUSTMENT -Upright adjustment: Use plumb to fix the top of post and check whether its install position is upright. Then hammer the expanded bolt and tighten the ground bolt cap. Only can hammer the expanded bolt after the expired period of the concrete and the gap between base plate and ground surface must be filled with iron plate or concrete and then tighten the anchor bolts.! 4.2 PROCESS OF ADJUSTMENT...
user’s manual Chapter 6 Trouble Shooting Cause and Phenomena Resolutions method Failure phenomenon connection of power supply wires or zero wire is not Check and correct wires connection correct If the motor works when forcing the The motor doesn’t the AC contactor in the contactor down with an isolation rod, check run in lifting circuit of the motor does not...
user’s manual Chapter 7 Appendix 7.1 HYDRALIC SYSTEM -When pressed “UP” button to start the motor, to pump oil from oil tank to cylinder, and to push the cylinder piston to move. Overflow valve is closed and the pressure is been set before packing in factory, to ensure the maximum loading of lift.
Page 15
user’s manual 7.2 EXPLODED DRAWING OF MAICHINE...
Need help?
Do you have a question about the LJCC2040A and is the answer not in the manual?
Questions and answers