Summary of Contents for Dato LJCC2045A

  • Page 1 TWO POST LIFT LJCC2045A ’ ’ Manufacturer:...
  • Page 2 MANUFACTURE AND SERVICE AGENT TWO POST LIFT Model: Serial no.: Manufacture date: Manufacture: Name: Address: Telephone: Fax: http: E-mail: AUTHORIZED SERVICE CENTRE...
  • Page 3 INSTRUCTION -Though we have considered about the machine safety during design and manufacture, proper training and frequent operation can be better for the safety. Forbid to operate or repair the lift without reading this user’s manual. -Check the nameplate on motor and currency request on nameplate, only professional electrician is allowed to connect the power.
  • Page 4: Chapter 2 Description Of Machine

    Chapter 1 Packing Discharge the outside packing and other packing material, to check whether any damage or missing during transportation according to “packing list”. If find damage or missing, should notice the carrier immediately. PACKING Standard scheme: main post and its components, sub post and its components(1#) , hydraulic unit(2#)...
  • Page 5 -There are orientation device on the arms, to lock arms when they are in proper position, which can prevent the vehicle from slipping. Chapter 2 Description of machine 2.4 CONFIGURATION DRAWING: Picture 1 (dimension drawing)
  • Page 6 Chapter 2 Description of machine Picture 2 (arm extension drawing)
  • Page 7: Technical Parameter

    Chapter 2 Description of machine 2.5 TECHNICAL PARAMETER Item Parameter Drive Electrical hydraulic Max lifting weight 4500kg Lifting height 1830/1890mm 4000kg Original height 98/160mm ≤50S Lifting time ≤60S Lowering time Pass width 2390mm Overall width 3120mm 3440mm Overall weight 5100 mm 870 kg Voltage AC 400V or 230V ±...
  • Page 8: Chapter 3 Installation

    Chapter 3 Installation 3.1 INSTALLATION NOTIC -Improper installation will cause damage to machine or personnel. We do not take responsibility to any direct or indirect damage due to improper installation or operation. -The proper installation floor should be level, to ensure level lifting and lowering. Any slant can affect the performance of the machine.
  • Page 9 Chapter 3 Installation 3.2.3 INSTALLATION DRAWING OF POST Picture 4 (post installation) Notice: Drill hole withφ19mm aiguille and then anchor with pneumatic tools. The depth of hole and bolts should be the same and insert the bolt. The air anchor, made against the washer to under the post. When fastening to the use of torque wrench, do not use impact tools to tighten.
  • Page 10: Installation Of Other Parts

    Picture 6(oil pipe list and installation) Chapter 3 Installation Picture 7 oil pipe connection cable 3.2.7 STEEL CABLE INSTALLATION 1 Open the cover of carriage and fix the carriage on the first tooth. Connect the steel cable and tighten the nut. 2 Set the carriage on the lowest locking point, and then adjust the steel cables.
  • Page 11 Chapter 3 Installation INSTALLATION OF ARMS: -Fix the long and short sway arms with hinge axis on the carriage according to the floor layout. -Install the correspond long and short extension arms and fix with M8×12 bolt to avoid slipping. -Put the adapter to the holes on extension arms (can choose differ height adapter to suit different height chassis)(see picture 8:) Bolt limit...
  • Page 12: Preparation Before Adjustment

    Picture 10 (up limit switch connection) Chapter 4 Adjustment 4.1 PREPARATION BEFORE ADJUSTMENT -Upright adjustment: Use plumb to fix the top of post and check whether its install position is upright. Then hammer the expanded bolt and tighten the ground bolt cap. Only can hammer the expanded bolt after the expired period of the concrete and the gap between base plate and ground surface must be filled with iron plate or concrete and then tighten the anchor bolts.!
  • Page 13: Chapter 6 Trouble Shooting

    -Check the steel cable every three months and if there is some abrasion, something wrong, stops using and contact with the manufacturer. -Check the integration of the insurance system every day. When change hydraulic oil, put machines to the lowest position, have the oil tank empty, when add new oil, should be filled by filter.
  • Page 14: Chapter 7 Appendix

    Chapter 7 Appendix 7.1 HYDRALIC SYSTEM -When pressed “UP” button to start the motor, to pump oil from oil tank to cylinder, and to push the cylinder piston to move. Overflow valve is closed and the pressure is been set before packing in factory, to ensure the maximum loading of lift.
  • Page 15 7.2 EXPLODED DRAWING OF MAICHINE...
  • Page 16 Circuit diagram(220V) :...
  • Page 17 Circuit diagram(380V) :...