Prior to installation we recommend that the installer verify the product intended application is
applicable to your current installation needs. The system application for this model combination is dual
heat, gas or oil furnace as standby, outdoor heat pump unit, and the heat pump manufacturer's room
thermostat. If your application does not include dual heat with standby furnace, but electric heat with an
air handler, do not use this WarmFlo II series or this installation manual. Contact factory for other
models (EM-WE series, WF-DH*** kits, etc.).
EM-WU***** – WarmFlo Electro-Mate ranging from 10 kW to 25 kW. Can be installed in upflow
applications only.
EM-WD***** – WarmFlo Electro-Mate ranging from 10 kW to 25 kW. Can be installed in downflow
and horizontal applications.
Caution, Heat Pump Application: Depending upon mechanical positioning and airflow, in all
cases (heat pump) the electric element, Electro-Mate, unit must be on the supply or warm side of
the HP refrigerant coil.
First-time or non-routine user – before attempting installation or setup, suggest studying the last section
of this manual, operational information and terminology definitions. Attached HD320 is also a training
document. Also if you have not attended a WarmFlo training session, call the factory for other
descriptive documents or PowerPoint.
**Installation Notice - Upon installation it is necessary that all the components of the heating system are
in place and functional. This controller is designed to operate the complete heating system - heat pump,
backup furnace (gas or oil), Electro-Mate, room thermostat, WF outdoor sensor, etc. If one of these
components is missing or not initially installed, improper performance of WarmFlo II and the system may
be experienced. In other words, if the gas furnace doesn't exist, LP tank not yet installed or filled, and the
WarmFlo II is operating on a cold day; do not be disappointed if there is no heat.
Warranty/Checkout – Attached to this manual is a warranty certification and checkout procedure. This
must be completed and returned for warranty coverage.
1. All installation work must be performed by trained, qualified contractors or technicians. Electro
Industries, Inc., sponsors installation and service schools to assist the installer. Visit our web site at
electromn.com for upcoming service schools.
2. All electrical wiring must be in accordance with National Electric Code and local electric codes,
ordinances, and regulations.
3. Observe electric polarity and wiring colors. Failure to observe could cause electric shock and/or
damage to the equipment.
4. This unit can only be used for its intended design as described in this manual. Any internal wiring
changes, modifications to the circuit board, modifications or bypass of any controls, or installation
practices not according to the details of this manual will void the product warranty, the ARL
certification label, and manufacturer product liability.
responsible for field modifications, incorrect installations, and conditions which may bypass or
compromise the built-in safety features and controls.
5. The only approved installation for this Electro-Mate series is upflow and horizontal furnace and
above or downstream from the air conditioning or heat pump A-coil. Any other configuration or
furnace plenum/ducting installation voids warranty and manufacturers product liability.