Download Print this page

Intelligas 100 Series Installation Manual

Gas ventilation interlock system

Advertisement

Quick Links

INTELLIGAS
Gas safety & control systems
100 Series Gas Ventilation
INSTALLATION
Interlock System
GUIDE
Intelligas takes every care in ensuring these products reach you in perfect working order.
Each system is tested on dispatch and site induced damage
is
easily detectable.
Ensure the operation of this unit is explained fully to the kitchen staff.
24 hour technical support line - 02381 290444
intelligas.co.uk

Advertisement

loading
Need help?

Need help?

Do you have a question about the 100 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Intelligas 100 Series

  • Page 1 INSTALLATION Interlock System GUIDE Intelligas takes every care in ensuring these products reach you in perfect working order. Each system is tested on dispatch and site induced damage easily detectable. Ensure the operation of this unit is explained fully to the kitchen staff.
  • Page 2 Introduction Thank you for choosing an Intelligas product. Please follow these instructions to ensure a safe, functional and long-lasting installation. This information is important and should be read and understood before attempting installation. If you are unsure of the terminations and their design voltages or function then refer to this guide or our technical support line, you can call 02381 290444 or you can text 07952269791 and we’ll get back to you as soon as we’re...
  • Page 3: Field Wiring

    The advice given on these instruction pages, specifically to cable types and ratings may change depending on cable lengths and installation conditions. If you are not sure about any of the cable types or ratings then contact our technical support team. INTELLIGAS intelligas.co.uk...
  • Page 4 Site sensor in negative air* *suction side of fan If fire alarm interface is not to be used then link as shown. This termination is low voltage and no isolation relay between the Intelligas panel and the building fire alarm is required.
  • Page 5 Intelligas gas proving system mechanical layout To comply with gas regulations manual isolation points, purge points and test nipples may be required. This drawing is for information only and the necessity of the above items should be checked to ensure compliance with the current regulations.
  • Page 6: Installation Schematic

    fitted (always try to site in negative pressure) To Fire Alarm panel if required. PANEL Remote emergency CANOPY Stop buttons 230v power supply Main valve COOK LINE APPLIANCES Gas solenoid must be installed by gas safe engineer intelligas.co.uk...