Snap-on Equipment EELS540A Installation, Operation & Maintenance Manual

Snap-on Equipment EELS540A Installation, Operation & Maintenance Manual

Two post surface mounted lift

Advertisement

Quick Links

S
-
E
NAP
ON
QUIPMENT
Installation, Operation & Maintenance Manual
Two Post Surface Mounted Lift
M
EELS540A, EELS541A
ODELS
EELS743A, EELS744A
16,000
. C
- 4000
. P
A
LBS
APACITY
LBS
ER
RM
309 Exchange Avenue, Conway, AR 72032
TEL: 800-225-5786
IMPORTANT:
READ THIS MANUAL COMPLETELY BEFORE
INSTALLING or OPERATING LIFT
EAZ0080V84A - Rev. 07/29/2021

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EELS540A and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Snap-on Equipment EELS540A

  • Page 1 QUIPMENT Installation, Operation & Maintenance Manual Two Post Surface Mounted Lift EELS540A, EELS541A ODELS EELS743A, EELS744A 16,000 - 4000 APACITY 309 Exchange Avenue, Conway, AR 72032 TEL: 800-225-5786 IMPORTANT: READ THIS MANUAL COMPLETELY BEFORE INSTALLING or OPERATING LIFT EAZ0080V84A - Rev. 07/29/2021...
  • Page 2: Specifications

    16,000LBS 2-Post Lift Installation, Operation and Maintenance ENERAL PECIFICATIONS Specifications EELS540A / EELS743A EELS541A / EELS744A Installation Height Standard -6" -12" Standard -6" -12" 174” [14’-6”] 168” [14’-0”] 162” [13’-6”] 198” [16’-6”] 192” [16’-0] 186” [15’-6] Column Heights (4420mm) (4267mm)
  • Page 3 16,000LBS 2-Post Lift Installation, Operation and Maintenance ROPER MAINTENANCE AND INSPECTION IS NECESSARY ERTICAL LEARANCE FOR SAFE OPERATION Check the height of the area where the lift is to be DO NOT OPERATE A DAMAGED LIFT installed. Clearance should be calculated based on Safety decals similar to those shown here are found the full raised height of the lift.
  • Page 4: Installation

    16,000LBS 2-Post Lift Installation, Operation and Maintenance acknowledgement by the carrier of receipt in good Refer to ANSI/ALI ALIS (current edition) condition of shipment covered by our invoice. MPORTANT Always wear safety glasses while installing lift. If any of the goods called for on this bill of lading are OOLS MINIMUM REQUIRED shorted or damaged, do not accept them until the...
  • Page 5: Base Plate

    16,000LBS 2-Post Lift Installation, Operation and Maintenance 5) Determine the sheave location on the bracket 7) Route a cable through a carriage and out the based on Column Extension Height, see Fig 2. bottom. Route it back up and into the inside hole Note: The column has been assembled with at the top of the carriage, see Fig 2.
  • Page 6 16,000LBS 2-Post Lift Installation, Operation and Maintenance Measure both carriage heights to ensure they are ELEASE in the same lock position. 19) IMPORTANT: Place a safety support inside each column as a backup to the locks since the hydraulic cylinders are no longer engaged with the carriages.
  • Page 7 16,000LBS 2-Post Lift Installation, Operation and Maintenance COLUMN COLUMN COLUMN COLUMN COLUMN EXTENSION EXTENSION EXTENSION EXTENSION EXTENSION TABS TABS TABS TABS TABS INSTALLATION AID INSTALLATION AID INSTALLATION AID INSTALLATION AID INSTALLATION AID INSTALL 1/2" HEX FLANGE BOLT INSTALL 1/2" HEX FLANGE BOLT INSTALL 1/2"...
  • Page 8 16,000LBS 2-Post Lift Installation, Operation and Maintenance 30) Mount synchronizer cables to carriages as shown in Fig. 10. Note: Use the proper Take-Up Tube as shown in Fig 10 based on the width of the lift. YDRAULICS IMPORTANT: To ensure proper hose fitting seal without damage to the fitting follow this procedure for each hose connection: Screw flared fitting on finger tight.
  • Page 9 16,000LBS 2-Post Lift Installation, Operation and Maintenance Route hose across overhead to the other side. Clamps are not needed yet 37) Uncoil Power Side hose and loosely attach it to the Hydraulic tee fitting ( in hardware box 38) Bring the Power Unit Hose and Power Side Hose up the column to the lowest available hole of the column extension.
  • Page 10 16,000LBS 2-Post Lift Installation, Operation and Maintenance 40) If installing a CL16-0, use the Routing Diagram C 41) Route the overhead hose based on the lifts height in Fig 14. If installing a CL16-2 use the table in Fig and width. To make a loop, twist the hose. Loosely 14 to determine the proper routing diagram A, B, connect the overhead hose to the other end of the OR C.
  • Page 11: Lock Release

    16,000LBS 2-Post Lift Installation, Operation and Maintenance ELEASE 48) Assemble the fittings to the air valve, Fig. 16, with WIRE WIRE WIRE WIRE the barbed fitting (3/8” hose barb x 1/8NPT) in port WITH WITH WITH WITH 1/8" AIR 1/8" AIR 1/8"...
  • Page 12 16,000LBS 2-Post Lift Installation, Operation and Maintenance 59) Lubricate the arm pin or carriage arm pin hole with “anti-seize” and install the arms. Install the Arm Pin Snap Ring. 60) Install the Arm Restraints with the 1/2”-13 Socket Head Cap Screws. Ensure that the arm restraint threads engage and disengage properly.
  • Page 13: Final Adjustments

    16,000LBS 2-Post Lift Installation, Operation and Maintenance INAL DJUSTMENTS YNCHRONIZING ABLES 78) Raise lift and ensure carriages lower into same YDRAULICS lock position. 73) Lower the lift to the floor and raise the lift 79) Adjust synchronizing cables so the tension is approximately one foot.
  • Page 14 16,000LBS 2-Post Lift Installation, Operation and Maintenance (Normally Open) FIELD CONNECTIONS LOAD INPUT Fig 21 – Electrical Wiring Diagram Page 14 EAZ0080V84A - Rev. 07/29/2021...
  • Page 15: Operation Procedure

    16,000LBS 2-Post Lift Installation, Operation and Maintenance Requirements for Operation, Inspection and PERATION ROCEDURE Maintenance; and in the case of frame engaging lift, ALI/LP-GUIDE, Vehicle Lifting Points/Quick AFETY OTICES AND ECALS Reference Guide for Frame Engaging Lifts; in a This product is furnished with graphic safety conspicuous location in the lift area convenient to warning labels, which are reproduced on page the operator.
  • Page 16: Lifting A Vehicle

    16,000LBS 2-Post Lift Installation, Operation and Maintenance IFTING A EHICLE OSS OF POWER 1) Ensure that the lifting arms are parked, out to full If for any reason the lift will not raise off the locks or drive thru position. the locks will not retract, consult factory authorized personnel.
  • Page 17: Maintenance

    16,000LBS 2-Post Lift Installation, Operation and Maintenance AINTENANCE To avoid personal injury, permit only qualified personnel to perform maintenance on this equipment. Maintenance personnel should follow lockout/tagout instructions per ANSI Z244.1. The following maintenance points are suggested as the basis of a routine maintenance program. The actual maintenance program should be tailored to the installation and include a record of each planned maintenance activity and repair maintenance activity...
  • Page 18: Parts Breakdown

    12310-2 COLUMN EXTENSION PACK (16’-6” O.A. Ht.) Items (2, 13, 14, 66, 67, 68, 69) Replace all worn, damaged, or broken parts with parts approved by Snap-on Equipment or with parts meeting Snap-on Equipment specifications. Contact your local Snap-on Equipment Representative or...
  • Page 19 16,000LBS 2-Post Lift Installation, Operation and Maintenance PARTS BREAKDOWN (continued) Fig B. Lock-Power/Idler Page 19 EAZ0080V84A - Rev. 07/29/2021...
  • Page 20 ANCHOR BOLT, 3/4” x 5 1/2” lg 37072 SNAP ON LOCK COVER Replace all worn, damaged, or broken parts with parts approved by Snap-on Equipment or with parts meeting Snap-on Equipment specifications. Contact your local Snap-on Equipment Representative or Call Snap-on Equipment (800-225-5786) Page 20 EAZ0080V84A - Rev.
  • Page 21 31115 1/4 WASHER NYLON SPACER 1/4x1/4 12748 Replace all worn, damaged, or broken parts with parts approved by Snap-on Equipment or with parts meeting Snap-on Equipment specifications. Contact your local Snap-on Equipment Representative or Call Snap-on Equipment (800-225-5786) Page 21...
  • Page 22 0 / 2 / 4 6” TAKE-UP TUBES [ STD HEIGHT: 0 -6: 2 -12: 4 ] Replace all worn, damaged, or broken parts with parts approved by Snap-on Equipment or with parts meeting Snap-on Equipment specifications. Contact your local Snap-on Equipment Representative or...
  • Page 23 16,000LBS 2-Post Lift Installation, Operation and Maintenance PARTS BREAKDOWN (continued) Fig F. Carriage & 3-Stage Arms Page 23 EAZ0080V84A - Rev. 07/29/2021...
  • Page 24 M8 x 30 SOCKET HEAD CAP SCREW 12200 ARM ASSEMBLY, 3-STAGE Replace all worn, damaged, or broken parts with parts approved by Snap-on Equipment or with parts meeting Snap-on Equipment specifications. Contact your local Snap-on Equipment Representative or Call Snap-on Equipment (800-225-5786) Page 24 EAZ0080V84A - Rev.
  • Page 25 16,000LBS 2-Post Lift Installation, Operation and Maintenance REVISIONS • 06/18/2021- NEW PRODUCT RELEASE • 07/19/2021- UPDATED IMAGES, OVERALL INSTRUCTION, AND PARTS BREAKDOWN • 07/29/2021- ADDED STEP 55, UPDATED SPEC PAGE • 08/30/2021 – UPDATED SPEC PAGE AND ADDED SALES CHANNEL INFORMATION. CHANGE “HEX WRENCH”...

This manual is also suitable for:

Eels541aEels743aEels744a

Table of Contents