■ In the Case of Document Insertion
Unit
1. Install the 2 Latch Plates to the Document Insertion
Unit.
• 4 Screws (Binding; M4 x10)
4x
2. Install the Positioning Pin.
• 2 Screws (Binding; M4 x10)
2x
■ Connection with the Upstream
Equipment
NOTE:
Although the host machine is used in the following
illustrations, the procedure is the same.
閲 FT2-0208-030_20160510.pdf
8
1. Open the Front Cover of this equipment.
2. Loosen the screw, and turn the connection lever to
raise the hook.
1x
Loosen
8
1. Installation
2016/05/10
14:39:52