1. Operation Notice
1. Please clean the inner cavity of the water supply pipe before installing the faucet to
2. The installation table must be perforated according to the product requirements.
ensure there is no foreign matter in the pipe;
The diameter of the hole is recommended to be between
3. Working condition working: Pressure 0.5-10 Bar (Including hot and cold pressure).
Applicable water temperature: 5
2
1
7
C-90
o
OPEN
2
3
4
5
6
C
o
7
Water Inlet Hose
6
Lock Screw
5
Lock Nut
4
SUS Gasket
3
Rubber Gasket
2
Tall spacer
1
Body Group
NO.
NAME
33 and
40;
Ø
Ø
2
2
1
1
1
1
1
QTY