O N Field Installation; Power Supply; Mobile Kit; Solar Power Kit - icoms I-SAFE User Manual

Speed display
Table of Contents

Advertisement

3.3 O
N FIELD INSTALLATION
1. Place the upper clamp:
3. Secure the installation by mounting the lower
clamp:
3.4 P
OWER SUPPLY
Your reseller offers several power kits.

3.4.1 Mobile kit

Composition:
A 12 V 24 AH battery
-
A 3-steps network charger (Figure 1,marks 25 and 17): when charging from the grid, a
-
red/orange indicator lamp is lit on the external charger. The battery is fully charged when
the green lamp is lit.
After placing the battery in the slot, connect the plug of the battery into the socket, and close the slot
with the screws to ensure the water tightness.

3.4.2 Solar power kit

The kit is composed by a 12 V 24 AH battery and a solar panel. The solar regulator is mounted inside
the unit.

3.4.2.1 Mounting and installation

Place the solar panel on a mast, according to the manufacturer's instructions. Turn it to the south,
avoiding shadow. For the mounting of the Icoms' solar panel, see further in this document, p. 55.
2. Hang the unit on the upper clamp with the
upper hook:
4. Slope/tilted pole: compensate the slope or
the tilt.
5. Power the system:
- Battery
- Solar panel
- Public lighting
- 230 V network
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-safe 1I-safe 2

Table of Contents