freightliner Custom Classic MT45 2022 Maintenance Manual page 137

Walk-in van chassis
Table of Contents

Advertisement

Electrical, Instruments, and Controls
1
2
06/01/2020
The hooked end exits the other side of the battery pack.
1. Glow Rod
Fig. 13, Pushing the Hooked End of the Rod Through
the Desiccant Chamber
NOTE: Two technicians are needed for the fol-
lowing step.
8. Carefully push the new battery pack desiccant
from one end of the battery pack and pull it from
the other end, as shown in
9. Tuck both ends of the battery pack desiccant se-
curely into the desiccant chamber of the battery
pack. See
Fig.
16.
10. Apply Vibra-Tite 42050 thread sealant as needed
to the salt plugs that were removed earlier (or
new salt plugs if they were replaced). See
17.
11. Install the salt plugs at each end of the battery
pack desiccant chamber using a calibrated
torque wrench with a 17 mm Allen socket.
Tighten the plugs 22 lbf·ft (30 N·m). For refer-
ence, refer to
Fig. 7
12. Install the battery pack manual service discon-
nect removed earlier. See
Walk-In Van Chassis Maintenance Manual, January 2022
f547234
2. Hook
Fig.
15.
Fig.
and
Fig.
9.
Fig.
8.
1
2
06/01/2020
1. Glow Rod (hook-end)
2. Grommet
3. Battery Pack Desiccant
Fig. 14, Attaching a New Battery Pack Desiccant to the
Glow Rod
06/01/2020
Fig. 15, Pulling Desiccant Through the Battery Pack
54
3
f547226
f547236
54/7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents