3.3 AC Wiring
All AC Wiring is completed within the ACC-1500-500 that is premounted to the PVS-500 rack.
The ACC1500-50 AC Combiner enclosure is rated Type 3R and will maintain this rating when
the user follows appropriate installation methods.
STEP 1: Confirm that all wiring and associated components are de-energized
Confirm that the AC switch on the AC Combiner is in the "Off" position.
Confirm that the AC switch on the XGI 1500 inverters (on the rack with other
equipment in the PVS-500 DC-Coupled Storage system) are in the "off" position (Fig
4.1).
Confirm there is no voltage at the terminals for the XGI 1500 inverters' AC output
conductors in the ACC1500-500 AC Combiner.
Rotate the XGI 1500 Inverter AC Disconnect to the "Off" position
STEP 2: Prepare the Enclosure for Conduits
Note the target area for conduit connections for the combined AC Output Circuit, on
the bottom face of the ACC1500-500 AC Combiner, as shown in Figure 4.2. Only
the shaded areas indicated should be used.
Add the holes for the conduit and fittings. The AC Combiner provides adequate
space for 2" – 3" conduits for the 3-phase 600VAC conductors.
Remove all metal shavings and debris from the inside of the AC Combiner.
Remove all metal shavings and debris from the inside of the ACC1500-500
AC Combiner enclosure.
Yaskawa Solectria Solar
DOCR-071069
Page 6 of 24