IBM 727 Manual Of Instruction page 27

Magnetic tape unit and tester, electronic data-processing machines
Table of Contents

Advertisement

Systems
02E
The tim e-delay point closes.
05E
75.10.02
75.10.01
When tape gets in either column (assume the left column), its flapper valve opens,
dropping R9.
up against its stop capstan, pinching the tape.
umn, dropping RIO. If tape were not pinched by dropping R9, the left column would
take all the tape spilled from both reels.
05F
05E
06G
06H
75.10.02
06B
05G
05E
-
04D
Sequence of
Operation
Manual start line
R9BL, R10BL, R31-6
goes up.
Pick HD6, take-
Time delay point
up mtr. start.
Start take-up mtr.
HD6 pts.
1/2 power applied
R4ALn/o, R12ALn/c,
to left stop clutch.
R7BL, time delay p t .,
R7AUn/o
The manual start line goes down (02E), pushing the left moving pulley
Drop R8, head
R9BU, R10BU, head
cover not down.
cover down m icro­
switch
Drop HD6, take-
R8BU
up mtr. start.
Drop HD8; retract
R8AUn/o
capstans.
Pick DP2, cap­
R8AUn/c
stan mtr.
Start capstan mtr.
DP2 pts.
Drop capstan r e ­
HD8 pts.
tracting solenoid.
"Caps in" microswitch
Drop R7, caps,
in.
Drop DPI, re ­
R7AU
verse field.
Drop R4, clutch.
R7AL
Conditions
Start to the moving coil
is incidental at this time.
With 1/2 power on both
stop clutches, the take-
up mtr. spills tape into
the columns.
The tape then goes into the other co l­
Head cover is down and
tape is in both columns.
Stop the take-up mtr.
Capstans start turning.
Capstans start to extend.
27
Remarks

Advertisement

Table of Contents
loading

Table of Contents