SUMITOMO RECOMMENDED PROCEDURE
FutureFLEX Patch Panel Installation
PARA.
CONTENTS
1.0
General
2.0
Safety Precautions
3.0
Tools Required
4.0
Panel and Accessories
5.0
Installation of 2RU in Rack
6.0
Cable Management Spools and Splice Tray Holder Installation
7.0
Strain Relief Cable Entry
8.0
Cable Routing Inside Panel
201 South Rogers Lane, Suite 100, Raleigh, NC 27610
SEL is a Member of the Sumitomo Electric Industries, Ltd. Group
Sumitomo Electric Lightwave reserves the right to improve or modify these specifications without notice.
SP F04 052
SUMITOMO ELECTRIC LIGHTWAVE CORP.
(919) 541-8100 or 1-800-358-7378
www.sumitomoelectriclightwave.com
Document: SP F04 052
Date Issued: 09/20
Revision: 1
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Electric Lightwave FutureFLEX and is the answer not in the manual?

Questions and answers

Summary of Contents for Sumitomo Electric Lightwave FutureFLEX

  • Page 1 SUMITOMO ELECTRIC LIGHTWAVE CORP. 201 South Rogers Lane, Suite 100, Raleigh, NC 27610 (919) 541-8100 or 1-800-358-7378 www.sumitomoelectriclightwave.com SEL is a Member of the Sumitomo Electric Industries, Ltd. Group Sumitomo Electric Lightwave reserves the right to improve or modify these specifications without notice.
  • Page 2 For the optical fibers, do not exceed the Sumitomo’s FutureFLEX Patch Panels. The 2RU minimum bend radius of 30 mm. Fixed Patch Panel is compliant with all RoHS regulations and has the capacity 6 adapter • For splicing of optical fiber, it is important to panels.
  • Page 3 Document: SP F04 052 Date Issued: 09/20 Revision: 1 Cable routing Zip ties/ Cable ties rings Cable Strain Cable Relief Management Bracket Spools (X4) Cable ID sticker Screws required for assembly (sizes shown Hose on next page) Clamps Splice Tray Bracket Velcro for (3RU/4RU...
  • Page 4 Document: SP F04 052 Date Issued: 09/20 Revision: 1 12-24 x ½” long pan head screws to secure unit into rack (x4) 6-32x 3/16” long pan head screws for securing cable management spools 8-32 x 3/8” long pan head screws for securing cable entry strain relief bracket 10-32 x 3/8”...
  • Page 5 Document: SP F04 052 Date Issued: 09/20 Revision: 1 5.0 Installation of 2 RU in Rack 5.4 Install rack mounting brackets on side of 5.1 First, take off the front cover. See Figure 3. panel as shown in Figure 6. Figure 3: Slide front cover sideways to remove from panel Figure 6: 3 Screws fastened into rack...
  • Page 6 Document: SP F04 052 Date Issued: 09/20 Revision: 1 Figure 10: ST-01 splice tray(sold separately) installed. Note the winged nut must be screwed on after the splice tray Figure 8: Multiple positions allowed for cover. But can be used as shown without screwing in cable management spools cover for holding in place while splicing.
  • Page 7 Document: SP F04 052 Date Issued: 09/20 Revision: 1 6.4 Install insert back in panel, reinstall cover, 7.2. The bracket can be placed on either side and place laser and ID sticker on cover or of the patch panel as well as adjusted wherever needed.
  • Page 8 Document: SP F04 052 Date Issued: 09/20 Revision: 1 8.2 Using either a breakout kit or pigtails, splice and terminate fiber bundle and place splice into splice tray holder. See Figure 19. Figure 17: Back panel closed. 8.0 Cable Routing Inside Panel Figure 19: 6 x 12 fiber ribbon LC pigtails for termination into adapter 8.1.
  • Page 9 Document: SP F04 052 Date Issued: 09/20 Revision: 1 8.4 Replace insert back into panel, but do not replace cover. 8.5 Pull tray slightly out to place cable routing rings. See Figure 21. Figure 21: Cable routing rings inserted into specified holes in panel insert. 8.6 Use routing rings for patch connections and replace cover.