Page 1
E118-3-FF-SQ-PAIL MJM INTERNATIONAL CORPORATION Assembly Instructions E118-3TW-FF-SQ-PAIL ASSEMBLY INSTRUCTIONS NOTE: A PHILLIPS SCREWDRIVER OR A CORDLESS HAND DRILL IS REQUIRED TO TIGHTEN / SECURE ALL SCREWS. STEP 1 – CASTERS IDENTIFY COMPONENTS TO START ASSEMBLY SEAT SECTION WITH ARMS, COMMODE, FOLDING FOOTREST PVC BACKREST WITH MESH SLING.
Page 2
Direct Supply Direct Choice ® ™ DCE1187 MJM INTERNATIONAL CORPORATION -FF-SQ-PAIL DCE118-3-17-FF- BB-18-SQ-PAIL DCE118-3-17-FF- STEP 4 BACKREST & MESH SLING STEP 5 FOLDING FOOTREST SECURE USING 1/2’’ RETAINING SCREWS AND SECURE WITH VINYL STRAP. PILOT HOLES AS REFERENCE. LSB-18-SQ-PAIL Assembly Instructions...
Need help?
Do you have a question about the E118-3TW-FF-SQ-PAIL and is the answer not in the manual?
Questions and answers