Download Print this page

Sealey YK509FAH.V2 Instruction Manual page 3

50 tonne floor type air/hydraulic press with foot pedal

Advertisement

4.7.
PRESSURE GAUGE
4.7.1.
Remove the dust cap hex bolt from the pressure gauge (#58) and gauge fi tting (#57). DO NOT discard.
4.7.2.
Screw the pressure gauge (#58) and nylon ring (#56) into the pressure gauge fi tting (#57) until tight.
DO NOT over-tighten.
4.8.
ATTACH HANDLE TO RAM
4.8.1.
Fit handle F (#65) into handle recess F on pump assembly and secure with washer M8 (#65) and hex head screw M8x 20 (#59).
4.8.2.
Fit handle G (#67) into handle recess G on pump assembly and secure with washer M8 (#65) and hex head screw M8x 20 (#59).
4.9.
ATTACH CARRY HANDLE
4.9.1.
Secure the carry handle (#76) to under plate (#41) with screw for carry handle (#75).
4.10.
Place the V-blocks (#4), in the required orientation, onto the bed frame (#28).
WARNING! The V-blocks are heavy.
4.11.
AIR SUPPLY
4.11.1.
Connect a compressed air supply hose (fi g 1) to the quick coupler (male) (#81).
4.11.2.
The recommended working air supply is a pressure is between 108-123psi.
fi g.1
5. INSTALLATION
DANGER! Models are purpose designed to withstand greater loads than the hydraulic units can develop. For safety reasons, always
ensure the workpiece and press tools are secured on the table and will not flex or suddenly "give way" causing danger to
operator or the component.
5.1.
SECURE PRESS TO THE FLOOR
DO NOT attempt to move assembled press manually. When moving the press follow the instructions as detailed in Section 1.
5.1.1.
Move the press to the mounting location, and spot mark through fi xing holes in base section (#70) onto the fl oor.
5.1.2.
Check for any hidden wiring or cables, if needed change the location for the holes.
5.1.3.
Temporarily move the press to the side.
5.1.4.
Use a masonry drill bit to drill the four holes about 3" to 4" (75 to 100mm) deep into the concrete or wood, as necessary.
5.1.5.
Clean out the drilled holes.
5.1.6.
Position the press and align the holes in the base section with the holes in the fl oor.
5.1.7.
Use four concrete anchor bolts or lag bolts for wooden fl oors, (not included), to secure to the fl oor.
WARNING! To prevent serious injury DO NOT use damaged equipment. If abnormal noise or vibration occurs have the problem
corrected.
WARNING! Ensure the mounting surface is capable of withstanding the weight of the press and workpieces.
5.2.
BEFORE FIRST USE
5.2.1.
Before operating the press, purge the hydraulic system in order to eliminate any air that may have built up during transit. Open
the release valve and pump the handle several times and close the release valve. Should the system malfunction at any time,
repeating this process may resolve the problem.
DANGER! Models are purpose designed to withstand greater loads than the hydraulic units can develop. For safety reasons,
always ensure the workpiece and press tools are secured on the table and will not fl ex or suddenly "give way" causing danger to
operator or the component. Also ensure you have read and understood section 1 Safety Instructions.
6. OPERATION
6.1.
SETTING THE BED FRAME HEIGHT
6.1.1.
Turn the hand winch handle (#21) until the cables just takes the weight of the bed frame (#28).
6.1.2.
Remove the retaining clips (#26) from the back of the pins (#27) and withdraw the pins, store in a secure location.
6.1.3.
Use the hand winch handle (#21) to raise or lower the bed frame (#28) to the desired height.
6.1.4.
Re-insert the pins (#27) and the retaining clips (#26).
6.1.5.
Slacken off the hand winch (#21) so that the pins (#27) are taking the full weight of the bed frame (#28).
6.2.
Check that the release valve on the hydraulic unit is fully closed, ready for operating.
6.3.
Position the V-block (#4) or press tools to be used onto the table and align beneath the ram. Place workpiece onto the table or
V-blocks and align beneath the ram as required.
NOTE: Care must be taken to ensure a V-block does not fall from the press table. If necessary hold the configuration in position with
clamps (not supplied).
WARNING! DO NOT apply off centre loads.
6.4.
Connect the air supply to the foot pedal (#79) quick coupler (male) (#81).
6.5.
Use either of the handles or the foot pedal to lower the ram to the workpiece.
WARNING! Monitor the pressure gauge during operation to ensure that the rated capacity of the press is not exceeded.
6.6.
When the operation is complete turn the release valve anti-clockwise to release the pressure. The piston and the ram head will
retract automatically.
6.7.
Disconnect the air supply.
NOTE: Always keep the piston retracted after use to avoid corrosion.
© Jack Sealey Limited
Original Language Version
YK509FAH.V2 Issue 1 17/03/22

Advertisement

loading