Horizontal Left-Hand Instructions - Haier HB2400VA1M20 Installation & Operation Manual

10 to 12 seer 2 to 3.5 tons
Table of Contents

Advertisement

WARNING: If incorrect knockouts are removed, flooding will occur.
5) Reinstall in the Airhandler, the "A" coil pan assembly with the horizontal drain pan on the
left-hand side.
Note: Push the assembly completely to the rear of the cavity and assure it slips into channel
bracket at the rear of the cavity.
6) Replace the J-shape metal bracket or brackets on the vertical drain pan and place the
plastic oval gasket on horizontal drain pan. Reinstall access panels and flowrator making
sure not to over torque screws. Snap in the drain cover on the right lower service panel.
7) The Airhandler can now be placed in its left horizontal position as shown in Fig.2. The
Airhandler must be leveled and then pitched 1/4" toward drain side. Important: Drain pan
must be tested for proper drainage by pouring water into the pan. Traps must be installed
on the primary drain and on the secondary drain if used.
8) In all cooling applications, a secondary drain pan must be provided by the installer and
placed under the entire unit with a separate drain line properly sloped and terminated in an
area visible to the user.
WARNING: The "A" coil contains 150 p.s.i.g. of air pressure.
9)
Before setting up flowrator assembly for field brazing see page 12 or read the Warning
label on the lower access panel.
10) Failure to follow this installation requirements will cancel product warranty.

HORIZONTAL LEFT-HAND INSTRUCTIONS

Important: Read instructions below carefully.
Fig.2
6
Plastic
Drain
cover
Fig.1
Air flow
Secondary Knockout
Primary Knockout
oval
gasket

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hb2400vc1m20Hb3000va1m20Hb3600va1m20

Table of Contents