HCD-HPZ7/HPZ9
2-33. LEVER (LOADING R, LOADING L)
6 lever (loading R),
gear (IDL-G),
gear (IDL-H)
PRECAUTION DURING LEVER (LOADING R/L) INSTALLATION
30
2
SPR-T (loading L)
5 two hooks
Align the horizontal position.
lever (loading L)
Install the both levers so that they move symmetrically.
1
SPR-T (loading R)
3 two hooks
4 lever (loading L)
lever (loading R)