  • Page 1 MANUAL C275G C200G C140G Customer: Installing Company: Timbre&Signature Timbre&Signature CAREFULLY READ THE MANUAL BEFORE USE 00_FS-00 200221...
  • Page 2: Table Of Contents

    SUMMARY SUMMARY DIMENSIONS WARNING SHIPPING WASTE DISPOSAL TRANSPORT AND LIFTING D.P.I. FOR THE OPERATOR WARNINGS FOR THE MAINTENANCE TECHNICIAN PREPARATION OF THE EXCAVATION BOLLARD LAYING PROCEDURE OPERATION OF ASCENT AND DESCENT www.mac-srl.it 00_FS-00 200221...
  • Page 3: Dimensions

    DIMENSIONS C275G 1031 C200G 1035 C140G 1035 info@mac-srl.it 00_FS-00 200221...
  • Page 4: Warning

    • Any infraction will be prosecuted in accordance with the procedure prescribed by law. • MAC s.r.l. is exclusive owner of its registered trademark. The brand is affi xed on labels with CE conformity and on seals and danger adhesives.
  • Page 5: Warnings For The Maintenance Technician

    • For what concerns the movement operations, make reference to the “Transport and lifting” chapter. • MAC s.r.l. is not responsible about the non-compliance of its products and accessories installation methods. • The maintenance technician must insert the protections against the indirect contacts upstream of the power line, following the regulations in force according to the installation place.
  • Page 6: Preparation Of The Excavation

    All the concrete that covers the bollard and the well should contain special additives that isolate from water. Even just one well can be installed to suck the water of all the bollards installed. Little well with manhole EN124 Sewer network connection Immersion pump Little well or sewer network connection with immersion pump www.mac-srl.it 02_IN.Palmo_00 191203...
  • Page 7: Bollard Laying Procedure

    200mm) in the middle of the dig on the geotextile (the PVC pipe is necessary for the passage of the rain-water). The size “h” are very important to ensure that the formwork protrudes 20mm from the trampling line. mod. Palmo 1010 info@mac-srl.it 02_IN.Palmo_00 191203...
  • Page 8 Lead the cables from the cockpit to the buried formwork. Gradually insert the concrete verifying that the hole is fi lled uniformly. Deal the concrete so as to not to leave empty pockets of air, especially below the bollard. www.mac-srl.it 02_IN.Palmo_00 191203...
  • Page 9 + 0.02 + 0.00 P.02 + 0.02 + 0.00 N.B. Make the connection u.m.=m u.m.=m Make sure that the concrete is solidifi ed before to insert the extractable structure. N.B.: Remove the protections of polystyrene from the runner info@mac-srl.it 02_IN.Palmo_00 191203...
  • Page 10: Operation Of Ascent And Descent

    • push the head of the bollard and at, the same time, turn the key counterclockwise until the stop (be careful, in the opening mechanism there is a gas spring) • lower the bollard by pushing it down until its closing. www.mac-srl.it 02_IN.Palmo_00 191203...