Preparation For Operation - ulsonix USX-ST5 User Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21
A - Power indicator light
B - Overheating alarm light
C - Heating indicator light
D - Water shortage alarm light
E - Light - Steam ejection active light
F - Light- Unit is heated and ready for operation
G - Light - first steam level set (minimum steam output)
H - Light - Second steam level set (maximum steam output)
3.2.

Preparation for operation

POSITIONING OF THE UNIT
The ambient temperature must not exceed 40°C and ambient humidity should not
exceed 85%. Place the unit in a way that ensures good air circulation. Maintain a
minimum clearance of 10 cm from any wall of the unit. Keep the unit away from
any hot surfaces. Always operate the unit on a level, stable, clean, fireproof and
dry surface and out of the reach of children and persons of impaired mental,
sensory and intellectual functions. Place the unit in such a way that the mains plug
can be reached at any time. Ensure that the power supply to the unit corresponds
to that specified on the identification plate!
ASSEMBLY OF THE UNIT
Caution: Do not install the unit while it is plugged in or still hot after previous use.
1. Lift the flap covering the socket. Plug the steam hose plug into the socket.
Make sure that the plug is securely installed.
2. Install the selected attachment following the picture instructions below.
a) Working tips mount directly to the connector on the end of the steam
hose handle.
Place the working tip onto the nozzle until a "click" sound is heard.

Advertisement

Table of Contents
loading

Table of Contents