Huawei SUN2000-M2 Quick Manual page 6

Table of Contents

Advertisement

3.2
Installing the PE Cable
Do not connect the neutral wire to the enclosure as a PE cable. Otherwise, electric shocks may
occur.
The PE point at the AC output port is used only as a PE equipotential point, and cannot
substitute for the PE point on the enclosure.
It is recommended that silica gel or paint be used around the ground terminal after the PE
cable is connected.
3.3
Installing the AC Output Power Cable
Ensure that the protection layer of the AC output power cable is inside the connector, the
core wires are totally inserted into the cable hole, and the cable is connected securely. Failing
to do so may cause device malfunction or damage.
The hex key is delivered with the inverter and bound to the hanging kit at the bottom of the
inverter.
1. Connect the AC output power cable to the AC connector.
Hex key
Stripping requirements
5
Hex key
Hanging kit

Advertisement

Table of Contents
loading

Table of Contents