Gigabyte E152-ZE0 User Manual page 27

Amd epyc 7003 up server system - 1u gen4 nvme
Hide thumbs Also See for E152-ZE0:
Table of Contents

Advertisement

6
4
5
4 4
1 1
2 2
7
2 2
9
3 3
3 3
1 1
8
4 4
1 1
2 2
3 3
• When installing the heat sink over the CPU, use T30-Lobe driver to tighten the 4 captive nuts in
sequential order (1g2g3g4).
• The screw tightening torque: 8 ± 0.5kgf-cm (17.0± 1.0 lbf-in)
- 27 -
System Hardware Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

6ne152ze0mr-00

Table of Contents