Before You Start; Packing List; Assembly; U-Handle Version - Echo SRM-520ES/U Operator's Manual

Table of Contents

Advertisement

Available languages

Available languages

Packing list

 The following parts are packed separately in the packing box.
 When you have unpacked the box, please check the parts that it contains.
 Contact your dealer if anything is missing or broken.
1.
Engine and shaft tube
2.
U-handle
3.
Shield (for nylon line cutting head)
4.
Shield (for metal blade)
5.
Safety goggles (ANSI Z 87.1 compliant)
6.
Caution tag
7.
Shoulder harness

Assembly

 Read the operator's manual carefully to ensure that you assemble the product correctly.
Using a product that has been incorrectly assembled could lead to an accident or serious injury.

U-handle version

U-handle assembly

Before you start

8.
Nylon line cutting head
9.
3 cutter blade
10. Blade cover
11. Operator's manual
12. Locking tool
13. Socket wrench
14. L-wrench
WARNING
1.
Install handle assembling bracket (upper) (A) in handle as-
sembling bracket (lower) (D) and fix handle by tightening
handle assembling bolt (8 mm) (B) lightly.
2.
Adjust inclination of handle to adequate position (easy to op-
erate) and tighten firmly handle assembling bolt.
C: Washer
9
Before you start

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srm-520es

Table of Contents