LG LRTLS2403 Series Owner's Manual page 11

Hide thumbs Also See for LRTLS2403 Series:
Table of Contents

Advertisement

Available languages

Available languages

WATER VALVE INSTALLATION
4. REMOVE THE ICEMAKER FILL TUBE COVER
Remove and discard the icemaker fill tube
opening cover located on the upper right
side of the refrigerator; insert the icemaker
fill tube
all the way into the opening until
6
it stops.
5. SECURE THE FILL TUBE
Locate the marks on the back of the cabinet
where the fill tube
5 screws
on the marks and tap them with the
2
screwdriver to make a small hole. Fasten the
fill tube using the band
screws.
6. ATTACH THE BACK COVER
Fasten the back cover with the previously removed screws.
7 CONNECT TO WATER LINE
.
To connect to the home water supply, refer to the Water
Line Installation Instructions within the refrigerator's
Owner's Manual.
Once the home water supply line is connected and
turned on, be sure to turn the icemaker switch to the I
(on) position.
The icemaker will require 12 to 24 hours for ice to be
produced.
It is recommended to discard the first few batches of ice
prior to using a batch for consumption.
will be installed. Place the
6
and the Phillips
5
11
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ltcs20120 seriesLtcs20020 seriesLtcs20040 seriesLk75c

Table of Contents