Operation Manual / A170-M.. - A175-M..
2 Safety / 2.13 Safe operation
2.13
Safe operation
Mechanical hazards during operation
During standard operation, no mechanical hazards are caused by the turbocharger itself if it
has been properly installed.
Safety during commissioning and operation
Visually inspect your working environment before starting work.
u
Remove any obstacles and objects littering the workplace.
u
Check all pipes to and from the turbocharger for damage and leaks before commission-
u
ing.
Check turbocharger for recognisable damage or defects every 12 hours of operation or at
u
least once a day.
Report any damage and any alterations of operational characteristics to the responsible
u
department immediately.
In case of damage, take the turbocharger out of operation immediately and safeguard
u
against accidental/unauthorised use.
When switching on operating energy supplies (hydraulics, pneumatics, electricity), pay at-
u
tention to the risks that may occur as a consequence of this energy input.
© Copyright 2022 ABB. All rights reserved.
HZTL4033_EN
Rev.K
January 2022