Download Print this page
Recom RPX-1.0-EVM-1 Quick Start Manual

Recom RPX-1.0-EVM-1 Quick Start Manual

Advertisement

Quick Links

Features
Evaluation
Module
Description
The RPX-1.0-EVM-1 generates a constant output voltage selectable from 0.8V, 1.8V, 3.3V,
5V, 12V, 15V, or 24V from a DC input in the range of 4-36V. It has a maximum continuous output
current of 1A.
All the functions of the RPX-1.0 such as output voltage selection, control, power good, trim, and output
sense can be readily evaluated. Also the behavior in overload or over-temperature can be evaluated
easily before it is designed in.
The evaluation board also contains the filter components to meet EMC class B levels. Alternate
component positions are included to allow experimentation to optimize the EMC performance depending
on operating conditions and budget.
Selection Guide
Part
Input Voltage
Number
RPX-1.0-EVM-1
Notes:
Note1: refer to
Quick Start Guide
1.
Connect P3 to power supply (observe correct polarity!)
2.
Connect P4 to the load (no load operation is allowed. For 0.8Vout, please refer to safe
operating area in the
RPX-1.0
3.
The evaluation module is preset to 5Vout.
The output voltage can be selected with values of 0.8V, 1.8V, 3.3V, 5V, 12V, 15V, and 24V by
shorting a 0W resistor to the respective places as seen in the board silkscreen. For 0.8Vout,
please refer to safe operating area in the
4.
The sense pin is connected to the RPX output pin, so the preset voltage is very accurate at
the output of the RPX. To compensate any losses of the filter, remove the resistor at R2, and
solder a 0W resistor at R3.
5.
CTRL
The device is preset as normally on. It can be disabled by pulling the CTRL pad to GND.
Short R18 to disable the device.
Caution:
ESD sensitive. Always follow ESD preventative procedures when
handling the product!
www.recom-power.com
• Evaluation platform for RPX-1.0 buck regulator
module
• Thermal design considerations included
• EMI class B filter
• Easy evaluation of output voltage selection,
control, and sensing functions
Output
Range
Voltage
[VDC]
[VDC]
4 - 36
0.8, 1.8, 3.3, 5, 12, 15, 24
SAFE OPERATING AREA
of RPX-1.0 datasheet
datasheet)
datasheet.
RPX-1.0
Output
(1)
Current max.
[A]
1
REV.: 0/2020
Evaluation Module
RPX-1.0-EVM-1
P-1

Advertisement

loading
Need help?

Need help?

Do you have a question about the RPX-1.0-EVM-1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Recom RPX-1.0-EVM-1

  • Page 1 Description The RPX-1.0-EVM-1 generates a constant output voltage selectable from 0.8V, 1.8V, 3.3V, 5V, 12V, 15V, or 24V from a DC input in the range of 4-36V. It has a maximum continuous output current of 1A.
  • Page 2 RPX-1.0-EVM-1 Evaluation Module Specifications (measured @ Ta= 25°C, full load and after warm-up unless otherwise stated) Component Placement RPX-1.0-EVM-1 FOR EVALUATION ONLY www.recom-power.com/eval-ref-boards VOUT 4V to 36V 1A max. SENSE VOUT SELECT PGOOD CTRL GND TRIM SENSE Connector Description P1 (Not Mounted)
  • Page 3 RPX-1.0-EVM-1 Evaluation Module Specifications (measured @ Ta= 25°C, full load and after warm-up unless otherwise stated) Schematic L6 2220 L5 1206 L9 2220 L4 0805 L8 1206 L2 1008 RPX-1.0 L7 0805 VOUT L3 RLS-397 6, 7, 8 CTRL 9, 10, 11...
  • Page 4 RPX-1.0-EVM-1 Evaluation Module Specifications (measured @ Ta= 25°C, full load and after warm-up unless otherwise stated) OUTPUT VOLTAGE TRIMMING The RPX-1.0 offers the feature of trimming the output voltage by using external trim resistors. The values for trim resistors are shown in trim tables below according to E96 values;...
  • Page 5 RPX-1.0-EVM-1 Evaluation Module Specifications (measured @ Ta= 25°C, full load and after warm-up unless otherwise stated) DIMENSION AND PHYSICAL CHARACTERISTICS Parameter Type Value Dimension (LxWxH) 85.0 x 55.0 x 6.5mm Weight 21.2g typ. Layout Layer 2 Top Layer Bottom Layer...
  • Page 6 RPX-1.0-EVM-1 Evaluation Module Specifications (measured @ Ta= 25°C, full load and after warm-up unless otherwise stated) Comp. Description Manufacturer Part Number Manufacturer Remarks 10µF 50V X7R 1210 CL32B106KBJNNWE Samsung Electro-Mechanics 10µF 50V X7R 1210 CL32B106KBJNNWE Samsung Electro-Mechanics 10µF 50V X7R 1210...
  • Page 7: Packaging Information

    RECOM’s explicit written consent. A safety-critical application is an application where a failure may reasonably be expected to endanger or cause loss of life, inflict bodily harm or damage property. The applicant shall indemnify and hold harmless RECOM, its affiliated companies and its representatives against any damage claims in connection with the unauthorized use of RECOM products in such safety-critical applications.