hajdu Z30 SMART Manual page 23

Hide thumbs Also See for Z30 SMART:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 18
In case of improper connection and installation, you will lose all your guar-
antee and warranty rights!
THE TANK MUST BE INSTALLED AND OPERATED IN A FROST FREE
ENVIRONMENT!
At the installation location, suitable electrical and water supply and sewage
system must be ensured, and before mounting, the structure of the wall must
also be checked by an architect for compliance.
We recommend the following solutions for
mounting the appliance:
• For stone, brick or concrete wall of 100­150 mm
thickness:
50x5 mm (MSZ4342/DIN1017) flat steel rein-
forcement placed horizontally on the other-
side of the wall. From the rear side, hexagonal-
through bolts (M12 8.8, ISO4017/DIN933) and
wood construction washers (M12, DIN440R);
From the appliance side, M12 nuts (DIN934) and
washers (A13, DIN125) should be used.
• For thin walls:
On the rear side of the wall, vertically placed
60x30x6 mm U­shaped steel profile (MSZEN
10279/DIN1026) should be used for reinforce-
ment. From the rear side, hexagonal through
bolts (M12 8.8, ISO4017/DIN933) and washers
(A13, DIN125), and from the appliance side, M12
nuts (DIN934) and washers (A13, DIN125) should
be used .
• The hot water tank may be placed in section 1 or
2 indicated in the picture, observing the stand-
ard MSZ HD 60364.
• In case of vertically positioned hot water tanks,
at least 70 cm service distance must be left from
the side of the service opening.
• To decrease heat loss attributable to the hot wa-
ter pipe, the appliance should be installed the
closest possible to the water withdrawal loca-
tions. Hot water pipes should be added heat in-
sulation .
EN
9
3 2 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z50 smartZ80 smartZ120 smartZ150 smartZ200 smart

Table of Contents