Electro-Air EA-15000 Installation Manual

Electro-Air EA-15000 Installation Manual

Ignition/starter switch panel for two magnetos

Advertisement

Quick Links

EA-15000
Installation Manual
Ignition/Starter Switch Panel
For Two Magnetos
Electroair Acquisition Corp.
5097 Williams Lake Road
Waterford, MI 48329 U.S.A.
Phone: 248-674-3433 Fax: 248-674-4231
Email: sales@electroair.net
Electroair Acquisition Corp.
IM EA-15000
Page 1 of 10
Revision 01
Prepared by: EAC
02/04/2020

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EA-15000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Electro-Air EA-15000

  • Page 1 Installation Manual Ignition/Starter Switch Panel For Two Magnetos Electroair Acquisition Corp. 5097 Williams Lake Road Waterford, MI 48329 U.S.A. Phone: 248-674-3433 Fax: 248-674-4231 Email: sales@electroair.net Electroair Acquisition Corp. IM EA-15000 Page 1 of 10 Revision 01 Prepared by: EAC 02/04/2020...
  • Page 2: Table Of Contents

    OVERVIEW OF IGNITION/STARTER SWITCH PANEL INSTALLATION ..... 3 EA-15000 KIT DESCRIPTION & REQUIREMENTS ............4 EA-15000 KIT CONTENTS ..................... 4 RECEIVING AND ACCEPTANCE CHECKING OF EA-15000 KIT ........ 4 PRECAUTIONARY STATEMENTS: ................5 INSTALLATION OF EA-15000: ..................6 GLOSSARY AND ABBREVIATIONS: ................10 Table of Figures Figure 1: Configuration A Overall Dimensions ...............
  • Page 3: Overview Of Ignition/Starter Switch Panel Installation

    Overview of Ignition/Starter Switch Panel Installation Thank you for purchasing an Electroair EA-15000 Ignition/Starter Switch Panel. The next pages will provide a step-by-step process of installing the Ignition/Starter Switch Panel on the aircraft. Electroair hopes you will enjoy the experience and that this manual will provide clear direction and guidance through this process.
  • Page 4: Ea-15000 Kit Description & Requirements

    1. This kit replaces the rotary key switch on aircraft with an two magnetos. 2. 12V or 24V electrical system capable of 0.75A. Other items needed: 1. Basic tools and standard aircraft hardware required for mounting EA-15000 Ignition/Starter Switch Panel. 2. Electrical tools for cutting, stripping, and terminating various wiring. Also recommended is a good selection of cable ties for harness routing and tie-off, and a selection of shrink tubing for covering exposed electrical connections.
  • Page 5: Precautionary Statements

    POH to have MAG switch in OFF position during starting.  Consult with appropriate licensed mechanic.  Consult applicable service manuals for the aircraft. Electroair Acquisition Corp. IM EA-15000 Page 5 of 10 Revision 01 Prepared by: EAC 02/04/2020...
  • Page 6: Installation Of Ea-15000

    Installation of EA-15000: 1. General Overview and Recommendations:  Determine the proper location for the panel.  Determine the most appropriate mounting method.  Overall dimensions are provided in Figure 1 and Figure 2. Cutout dimensions are provided in Figure 3 and Figure 4. All dimensions are in inches.
  • Page 7: Figure 3: Configuration A Cutout Dimensions

     If the ignition/starter switch panel is not being installed in the rotary key switch location, plug the hole left by removing the rotary key switch as necessary. 3. Set-up & Installation of p/n: EA-15000 Ignition/Starter Switch Panel:  Review the leads corresponding to the location of the ignition/starter switch panel.
  • Page 8: Figure 4: Configuration B Cutout Dimensions

     Insulate any exposed electrical connections in accordance with 43.13-1B Change 1 section 11-159.  Insert ignition/starter switch panel into instrument panel and screw down using standard hardware. Electroair Acquisition Corp. IM EA-15000 Page 8 of 10 Revision 01 Prepared by: EAC 02/04/2020...
  • Page 9: Figure 5: Configuration A And B Back Surfaces

    Repeat the start-up process.  If the aircraft fails a second time, contact the factory for support. (248-674-3433 or sales@electroair.net) Electroair Acquisition Corp. IM EA-15000 Page 9 of 10 Revision 01 Prepared by: EAC 02/04/2020...
  • Page 10: Glossary And Abbreviations

    Must/Shall – a mandatory requirement RPM – Revolutions per Minute POH – Pilot’s Operating Handbook STC – Supplemental Type Certificate TDC – Top Dead Center Electroair Acquisition Corp. IM EA-15000 Page 10 of 10 Revision 01 Prepared by: EAC 02/04/2020...

Table of Contents