This manual will cover the following general installation steps: 1. General overview and recommendations 2. Removal of old ignition components 3. Set-up & installation of p/n: EA-13000 Ignition/Starter Switch Panel 4. Final installation steps Electroair strongly recommends reading through this entire installation procedure before installing the Electroair Ignition/Starter Switch Panel for your Electroair electronic ignition system equipped aircraft.
1. This kit replaces the rotary key switch on aircraft with an EIS kit installed. 2. 12V or 24V electrical system capable of 0.75A. Other items needed: 1. Basic tools and standard aircraft hardware required for mounting EA-13000 Ignition/Starter Switch Panel. 2. Electrical tools for cutting, stripping, and terminating various wiring. Also recommended is a good selection of cable ties for harness routing and tie-off, and a selection of shrink tubing for covering exposed electrical connections.
POH to have MAG switch in OFF position during starting. Consult with appropriate licensed mechanic. Consult applicable service manuals for the aircraft. Electroair Acquisition Corp. IM EA-13000 Page 5 of 10 Revision 03 Prepared by: EAC 02/04/2020...
Installation of EA-13000: 1. General Overview and Recommendations: Determine the proper location for the panel. Determine the most appropriate mounting method. Overall dimensions are provided in Figure 1 and Figure 2. Cutout dimensions are provided in Figure 3 and Figure 4. All dimensions are in inches.
If the ignition/starter switch panel is not being installed in the rotary key switch location, plug the hole left by removing the rotary key switch as necessary. 3. Set-up & Installation of p/n: EA-13000 Ignition/Starter Switch Panel: Review the leads corresponding to the location of the ignition/starter switch panel.
Insulate any exposed electrical connections in accordance with 43.13-1B Change 1 section 11-159. Insert ignition/starter switch panel into instrument panel and screw down using standard hardware. Electroair Acquisition Corp. IM EA-13000 Page 8 of 10 Revision 03 Prepared by: EAC 02/04/2020...
Repeat the start-up process. If the aircraft fails a second time, contact the factory for support. (248-674-3433 or sales@electroair.net) Electroair Acquisition Corp. IM EA-13000 Page 9 of 10 Revision 03 Prepared by: EAC 02/04/2020...
Must/Shall – a mandatory requirement RPM – Revolutions per Minute POH – Pilot’s Operating Handbook STC – Supplemental Type Certificate TDC – Top Dead Center Electroair Acquisition Corp. IM EA-13000 Page 10 of 10 Revision 03 Prepared by: EAC 02/04/2020...
Need help?
Do you have a question about the EA-13000 and is the answer not in the manual?
Questions and answers