ABB TPS48 Series Operation Manual page 120

Turbocharging
Hide thumbs Also See for TPS48 Series:
Table of Contents

Advertisement

NOTICE
© Copyright 2016 ABB. All rights reserved.
Taking out of operation
Shutting down the turbocharger
*) Diameter for turbine casing designs for optional C-ring sealing
Information about the turbine casing design (with / without C-ring seal-
ing) can be requested from an ABB Turbocharging Service Station.
Operation Manual / TPS48-D/E.. - TPS61-D/E..
9
9.1
Page 118

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tps52 seriesTps57 seriesTps61 seriesTps 57d01Ht843748

Table of Contents