Page 1
® ® We Engineer Confidence We Engineer Confidence ® ® 1RK-CHASSIS ONErack chassis Installation Guide V1.30 MNL-1RK-CHASSIS-V1.30 Mar 2019...
Page 2
In this guide In the box Building a kit chassis Building the chassis Contact us...
Page 3
6 mounting rails 4 Bolt strips 24 M4 screws 1 M6 rack mounting kit 4 4 In the unlikely event that a component is missing or damaged, please contact tech.usa@tvone.com or tech.europe@tvone.com. Tools Pozidriv® PZ2 crosshead screwdriver MNL-1RK-CHASSIS-V1.30...
Page 4
The kit box contains holes for 4RU, 5RU, and 6RU chassis. Make sure you use the correct holes for your chassis. Now go to step 3 of Building the chassis on page 5. tvONE...
Page 5
Building the chassis 1. Position the three lower rails with: A. The numbers facing upwards B. The space for the bolt strip facing outwards Use M4 screws to connect the rails to the side panel. MNL-1RK-CHASSIS-V1.30...
Page 6
2. Position the three upper rails with: A. The numbers facing downwards B. The space for the bolt strip facing outwards Use M4 screws to connect the rails to the side panel. tvONE...
Page 7
3. Slide an M3 bolt strip into each of the four mounting rails shown here. 4. Use the remaining 12 M4 screws to connect the other side panel to the mounting rails. MNL-1RK-CHASSIS-V1.30...
Need help?
Do you have a question about the ONErack 1RK-5RU-KIT and is the answer not in the manual?
Questions and answers