Download Print this page

Sealey STR600 Quick Start Manual page 3

Two level tyre rack 200kg per level

Advertisement

8. coNteNtS
Carefully unpack the product and check the contents against the list
below. Should any items be missing or damaged, immediately contact
your Sealey stockist.
Part Description: . . . . . . . . . . . . . . . . . . . . . . . Qty
a
Upright:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
B
Horizontal Brace: . . . . . . . . . . . . . . . . . . . . . . . . . . 2
c diagonal Brace: . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
D
Spacer:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
e
rubber Foot: . . . . . . . .not supplied with this model
f
Bolt m6 x 45mm: . . . . . . . . . . . . . . . . . . . . . . . . . . 6
G nut m6: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
H locking Pin: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
I
Cross Beam: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
9. aSSeMBly
Warning! Before assembly and use ensure you have read,
understood and apply Section 1 safety instructions.
9.1.
It is recommended that this tyre racking system be assembled by two people. When installing the cross beams it is advisable to use a
rubber mallet. Do Not use a hard faced hammer as this will damage the surface finish of the cross beams. make sure that all the clips
lock in place securely and safety bolts are fitted before using the unit. Do Not use any parts that are damaged and/or distorted as these
may assemble incorrectly and result in an installation that is unsafe and which may cause injury or damage when the shelves are loaded.
9.2.
aSSeMBlING tHe eND fraMeS: refer to (fig.4).
9.2.1.
Place the uprights (a1 & a2) on the floor with the inner edges facing each other and the rubber feet at the base.
9.2.2.
Take one horizontal brace (B1) and one spacer (D). Insert into the upright (a2) at the base area drilled hole and loosely secure using a m6
x 45mm bolt (f) and a m6 nut (G).
9.2.3.
Place the other upright (a1) so that the horizontal brace (B1) aligns with the base area drilled hole. Take one of the diagonal braces (c1)
and insert into the upright (a1) so that hole aligns with the hole in the horizontal brace (B1) and the drilled hole in the upright (a1). loosely
secure using a m6 x 45mm bolt (f) and a m6 nut (G).
Align the other end of the diagonal brace (c1) with the corresponding hole in the opposite upright (a2). Take another diagonal brace (c2)
9.2.4.
and align with the same hole on diagonal brace (c1) and on the upright (a2). loosely secure using a m6 x 45mm bolt (f) and a m6 nut (G).
9.2.5.
Align the other end of the second diagonal brace (c2) with the corresponding hole in the opposite upright (a1). Take a third diagonal brace
(c3) and align with the second diagonal brace (c2). loosely secure both to the upright (a1) using a m6 x 45mm bolt (f) and a m6 nut (G).
9.2.6.
Align the remaining end of diagonal brace (c3) with the top hole of the opposite upright (a2). Place a horizontal brace (B2) aligned with
the diagonal brace (c3) and across to the opposite upright (a1). loosely secure one end of horizontal brace (B2), along with the diagonal
brace (c3) to the upright (a2) using a m6 x 45mm bolt (f) and a m6 nut (G). Align the other end of the horizontal brace (B2) with the top hole
of the upright (a1). Place a spacer in the gap and loosely secure with a m6 x 45mm bolt (f) and a m6 nut (G).
9.2.7.
Check that the assembled frame is square and tighten all the fasteners.
9.3.
fIttING tHe croSS BeaMS: refer to (fig.5).
9.3.1.
Support one end frame in a vertical position and attach the end of
one cross beam (I) to it at the base of one of the uprights (a).
ensure that both tags on the end bracket engage properly with
the slots in the upright. Tap the cross beam gently next to the end
bracket so that the beam is properly seated into the slots in the
upright. Insert the locking pin (H) so that it is against the beam.
Connect the other end of the beam to the second end frame at the
same height,tap into place and secure with a locking pin (H).
9.3.2.
Attach another cross beam (I) to the other side of the end frames
ensuring that it is at the same level at the first cross beam.
9.3.3.
Continue to assemble the next two pairs of cross beams (I) at the
heights required. The end frames allow adjustment in 2" increments.
each pair of beams must be mounted at the same height. ensure
that all tabs on the cross beam brackets are fully engaged in the
slots in the uprights and that the cross beams are properly tapped
down into place then secured with a locking pin.
eNvIroNMeNt ProtectIoN
recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
Note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
Important: no liability is accepted for incorrect use of this product.
warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, kempson way, Suffolk Business Park, Bury St edmunds, Suffolk. IP32 7ar
01284 757500
© Jack Sealey limited
01284 703534
sales@sealey.co.uk
Original Language Version
fig.5
www.sealey.co.uk
STr600, STr600e | Issue 5 (H,F) 03/12/19
fig.4

Advertisement

loading