GE Zoneline AZ91 Owner's Manual page 13

Hide thumbs Also See for Zoneline AZ91:
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
Install the Drain Pan
NOTE:
Refer to instructions included in
proper installation procedures.
2. Place unit on the platform and
into the plenum until it is fully
seated.
must be attached to one of the
two primary drain connections
located to the right or left side of
located on the back of the unit is
the secondary drain if required
by state and local codes. A field
supplied secondary condensation
pan may be required. Refer
to the local codes for proper
installation of drain.
49-7772
Plenum
Typical Installation
of bottom seal
removed to
place drain pan
Shown with
condensate
draining to left.
Could also drain
to the right.
Platform
Vertical Seal
Bottom Seal
Mounting Holes

Advertisement

Table of Contents
loading

Table of Contents