LG ARNU36GTAB4 Installation Manual page 16

Ceiling cassette
Hide thumbs Also See for ARNU36GTAB4:
Table of Contents

Advertisement

Installation
4 Way
Keep the length of the bolt
from the bracket to 40 mm
Round
Keep the length of the bolt
from the bracket to 40 mm
2 Way
Keep the length of the bolt
from the bracket to 40 mm
Ceiling board
1 Way
Keep the length of the bolt
from the bracket to 40 mm
Ceiling board
16
Indoor Unit
Air Conditioner body
Ceiling board
Keep the length of 15 mm(TM, TM-A, TN,
TP, TP-B chassis), 31~34 mm(TQ,TR
chassis) between the air conditioner
bottom surface and the ceiling surface
Paper model
for installation
Air Conditioner body
Air Conditioner body
Paper pattern
for installation
Adjust the
same height
Air Conditioner body
Paper pattern
for installation
Adjust the
same height
Ceiling
105 mm(TM, TM-A, TN, TP, TP-B chassis),
180 mm(TQ,TR chassis)
Ceiling board
Set screw of
paper model (4 pieces)
Open the ceiling board
along the outer edge of the
paper model
Ceiling
Ceiling
Ceiling board
Ceiling board
Ceiling board
Set screw of
paper pattern (4 pieces)
Open the ceiling board
along the outer edge of the
paper pattern
Ceiling
Ceiling board
Ceiling board
Ceiling board
Set screw of
paper pattern (4 pieces)
Open the ceiling board
along the outer edge of the
paper pattern
Ceiling board
Ceiling board

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arnu24gtbb4Arnu30gtbb4

Table of Contents