Installation - Siemens LC94PBC50B Instructions For Installation And Use Manual

Hide thumbs Also See for LC94PBC50B:
Table of Contents

Advertisement

5Installation

Preparing the installation
I n s t a l l a t i o n
Caution!
Ensure that there are no electric wires, gas or water
pipes in the area where holes are to be made.
Mark a vertical centre line on the wall from the
1.
ceiling to the lower edge of the extractor hood.
Mark positions for the screws and the contour of the
2.
attachment area.
Drill 8mm Ø holes to a depth of 80mm and press
3.
the wall plugs flush with the wall.
Screw on the fixing bracket for the flue duct.
4.
Screw in 2 securing screws with washers to
5.
ª
approx.5mm.
¨
©
Installation
Attaching and aligning the appliance.
1.
Mark the hole for the safety screw.
2.
Remove the appliance once more.
3.
Finishing installation of the appliance
Drill an 8mm Øhole to a depth of 80mm for the
1.
safety screw and press the wall plug flush into the
¨
wall.
First remove the protective foil from the back of the
2.
appliance and, following installation, remove the foil
completely.
Connect the appliance.
3.
Screw in the safety screw - and washer - and tighten
4.
ª
all the screws.
Installation
¨
©
ª
©
en
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lc64pbc50b

Table of Contents