Installation

Step 2: Installing the Base

The base, also known as a pad is a raised platform. We recommend using a concrete base.
1.
Lay out position of 6 wedge anchors by measuring clearance between anchors
and inside edge of gate. Figure 5
2.
Install underground conduits in area for conduits. Figure 6
Size of concrete base
A minimum of 2" on each side of the operator is recommended.
Contact local underground utility locating companies before digging more than 12 inches deep to
avoid damaging underground power, gas or other utility lines.
Figure 5
6
Wedge Anchor
1/2" x 3 1/2"
Figure 6