Section 3. Unit Preparation; Section 4. Setting The Unit - Trane A4AC3018B1000B Installer's Manual

Condensing units
Hide thumbs Also See for A4AC3018B1000B:
Table of Contents

Advertisement

Section 3. Unit Preparation

3.1 Prepare The Unit For Installation
STEP 1 - Check for damage and report prompt-
ly to the carrier any damage found to the unit.

Section 4. Setting the Unit

4.1 Pad Installation
When installing the unit on a support pad, such
as a concrete slab, consider the following:
• The pad should be at least 1" larger than the
unit on all sides.
• The pad must be separate from any structure.
• The pad must be level.
• The pad should be high enough above grade
to allow for drainage.
• The pad location must comply with National,
State, and Local codes.
For other applications refer to application guide.
6
88-A4AC3001-1F-EN

Advertisement

Table of Contents
loading

Table of Contents