DIRECT VENT
INSTALLATIONS
WARNING
READ AND FOLLOW ALL
INSTRUCTIONS IN THIS SECTION.
FAILURE TO PROPERLY VENT
THIS FURNACE CAN CAUSE
CARBON MONOXIDE POISONING
OR AN EXPLOSION OR FIRE,
RESULTING IN PROPERTY
DAMAGE, PERSONAL INJURY
OR DEATH.
Direct vent installations require a
dedicated combustion air and venting
system. All air for combustion is taken
from the outside atmosphere and all
combustion products are discharged
to the outdoors. Therefore, no
ventilation or combustion air
openings are required.
IMPORTANT: The plastic combustion
air and venting components are of
Schedule 40 PVC. If using ABS
piping ensure that the solvent cement
is compatible for joining PVC to ABS
components or use a mechanical
connection that can withstand the
vent temperatures and are corrosion
resistant.
INSTALLATION GUIDELINES
All exhaust piping must be installed in
compliance with Part 7, "Venting of
Equipment," of the latest edition of the
National Fuel Gas Code NPFA54/
ANSI Z223.1-, local codes or
ordinances and these instructions.
1. Vertical piping is preferred.
2. All horizontal piping must slope
upward a minimum of
/
1
per foot of run so that condensate
drains toward the furnace.
3. All horizontal runs must be
supported at least every 4 feet.
No sags or dips are permitted.
4. IMPORTANT: Do not common
vent with any other appliance. Do
not install in the same chase or
chimney with a metal or high
temperature plastic pipe from
another gas or fuel-burning
appliance unless the required
minimum clearances to
combustibles are maintained
between the PVC pipe and other
pipes.
TABLE 2
FOR DIRECT VENT APPLICATIONS - AIR FOR COMBUSTION
PROVIDED FROM OUTDOORS
MAXIMUM ALLOWABLE LENGTH IN FEET OF EACH EXHAUST PIPE AND INTAKE AIR PIPE
FURNACE
PIPE
INPUT
SIZE
45,000
2"
2"
60,000
3"
2"
75,000
3"
90,000
3"
105,000
3"
120,000
3"
NOTES:
1. N.R. - NOT RECOMMENDED.
2. MAXIMUM OF 6 ELBOWS MAY BE USED. DO NOT COUNT ELBOWS IN ALTERNATE TERMINATION KIT.
MEDIUM OR LONG SWEEP ELBOWS MAY BE USED.
1
3. A 22
OR 45 DEGREE ELBOW IS CONSIDERED ONE ELBOW.
2
4. CONCENTRIC TERMINATION NO. RXGY-E03 IS FOR THRU-THE-ROOF OR THRU-THE-WALL VENTING.
5. USE KITS RXGY-DO2 (2"), RXGY-G02 (2") OR RXGY-D03 (3") FOR STANDARD OR ALTERNATE
THRU-THE-WALL VENTING.
6. USE KITS RXGY-D04 FOR ALTERNATE VENTING OF 120,000 BTUH UNITS WITH LONG RUNS.
5. For horizontal runs where water
may collect, wrap the vent pipe
with self-regulating 3 or 5 watt
heat tape. The heat tape must be
U.L. listed and installed per the
manufacturer's instructions.
inch
4
6. The minimum vent pipe length is
5 feet.
Size the exhaust and combustion air
intake pipes as specified in Table 2.
This table lists the maximum allow-
able length in feet of the exhaust and
combustion air intake pipes that may
be used for all furnace inputs as
related to the number of elbows
required and the termination (see
shaded area).
7. The maximum exposed vent
length (above the roof line) is
30 .
VENT TERMINATION
KIT RECOMMENDED
TERMINATION
(RXGY-D0* Kits for
Horizontal Venting Only)
Standard/Concentric
RXGY-D02/RXGY-E03/RXGY-G02
Alternate
RXGY-D02
Standard/Concentric
RXGY-D02/RXGY-E03/RXGY-G02
Alternate
RXGY-D02
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
Alternate
RXGY-D03
Standard/Concentric
RXGY-D02//RXGY-E03/RXGY-G02
Alternate
Not Recommended
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
Alternate
RXGY-D03
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
Alternate
RXGY-D03
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
Alternate
RXGY-D03
Standard/Concentric
RXGY-D03/RXGY-E03/RXGY-G02
Alternate
RXGY-D03
Alternate
RXGY-D04
NUMBER OF ELBOWS
45° or 90°
Medium / Long Radius ONLY
1 - 2
3 - 4
5 - 6
65
60
55
55
50
45
40
35
30
30
25
20
120
120
120
110
105
100
30
25
NR
NR
NR
NR
120
120
120
100
95
85
110
105
95
50
40
35
110
105
95
50
40
35
45
35
30
45
35
30
105
95
90
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents