Turning The Cartridge Group With Compressor And Turbine Casing; Fig. 74: Turning The Cartridge Group With Compressor And Turbine Casing - ABB HT611364 Operation Manual

Turbocharging
Table of Contents

Advertisement

Operation Manual / A150-M56/66/57/67 - A155-M..
10 Dismantling and fitting with removed air inlet and gas outlet / 10.14

Turning the cartridge group with compressor and turbine casing

10.14
Turning the cartridge group with compressor and
turbine casing
Fig. 74: Turning the cartridge group with compressor and turbine casing
1. Attach second lifting gear to bearing casing and secure to the crane hook. This lifting
gear must be attached during the entire rotating procedure.
2. Lift cartridge group with compressor and turbine casing with the first lifting gear and
lower it with the second lifting gear.
3. Remove second lifting gear and swivel lifting eye.
© Copyright 2022 ABB. All rights reserved.
HZTL4032_EN
Rev.S
February 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

A155-m seriesA150-m66A150-m series

Table of Contents