Download Print this page

Interlogix Advisor Installation Sheet page 2

Advertisement

AdvisorOne Panel
Installing the power supply in an AdvisorOne Panel:
Note: When choosing the AC outlet location for the external DC power supply, make sure the outlet is not controlled by a
switch or that it is not part of a ground fault circuit interrupt (GFCI).
1.
Depending on the situation, it may be necessary to contact the central monitoring station before starting the installation.
2.
If a power supply is present, remove the screw from the securement tab (A in Figure 1) and unplug the power supply.
3.
Remove the screw securing the panel chassis. Open the panel by pressing down on the tabs and carefully swing the panel
chassis open.
CAUTION: Use static electricity precautions when handling electronic components.
4.
Disconnect the battery from the battery connector by pressing down on the wire end of the battery clip.
5.
Remove the Terminal Cover by pressing the tabs down and rotating the cover upward.
6.
If an existing power supply is present, disconnect the wires from the existing power supply to the panel.
7.
Connect the spaded ends of the wire (C in Figure 1) to the terminals on the power supply (B in Figure 1).
Note: The dashed line/writing side of the wire indicates positive. Ensure consistency by wiring + to + and - to -. Unlike
previous panels, this is a DC power supply and polarity must be observed or damage may occur.
8.
Connect the other ends of the power supply wire (D in Figure 1) to the panel (E in Figure 1). Observe polarity.
9.
Secure the Terminal Cover onto the panel. Make sure the tabs are engaged. The terminal cover must be secured for proper
operation.
10. Supply power to the panel as noted in Table 1.
Table 1: Powering the Panel
Installation
Action
US
1.
2.
Canada
Plug the power supply into the outlet.
All Other Installations
Follow regional requirements.
Note: Connect the battery within 15 seconds of providing power from the power supply to reduce the potential for a
low battery indication.
11. Connect the battery to the battery connector on the panel. Note that the cable connector locks into place.
12. Close the panel, making sure all tabs are engaged. Replace the screw securing the panel chassis.
13. If the central monitoring station was notified, inform them this operation is complete.
2 / 4
On the new power supply, knock out the screw hole in the securement
tab.
Plug the power supply into the outlet and secure with the supplied
screw.
Note
Do not use the securement tab and screw.
Advisor Power Supply Installation Sheet

Advertisement

loading